Laserfiche WebLink
SECTION 1 -LANDFILL EXPANSION ISSUES Page 1-14 <br /> Table 1-4 <br /> SOILS AND EROSION CONTROL REGULATORY CRITERIA <br /> (Design element section still to be completed) <br /> Citation Regulation Design Element <br /> Title 14, 17628 Each site design shall be based on appropriate Initial geotechnical evaluation <br /> data regarding...soils.. showed that suitable soils for <br /> liner,daily, intermediate and I <br /> final cover are available on-site. <br /> Title 14, 17681 Availability of Cover Material: -sufficient quantity Mass balance shows that <br /> of cover material to meet requirements of these adequate material is probably <br /> standards. available for daily and <br /> intermediate cover. <br /> Title 14, 17682 Cover. (H)..cover material compacted to a Six inch minimum of daily <br /> minimum thickness of six(6) inches shall be cover will be used during <br /> placed over waste..frequency of..: operations. <br /> Tonnage greater than 50 per day-daily cover <br /> Tonnage from 5 to 50 per day-48 hours. <br /> Board shall consider any_application for different <br /> cover and compacting requirements ior special <br /> operating practices.. <br /> Title 14, 17684 Intermediate Cover.At the end of each day of Intermediate cover will consist <br /> operation of sites receiving Group 2 wastes, in all of a minimum of twelve inches <br /> but the finai'lift, a compacted layer of at 12 inches of compacted soil. <br /> of cover shall be placed on all surfaces of the fill <br /> where no additional refuse will be deposited within <br /> 180 days. <br /> Title 14, 17708 Drainage and Erosion Control: .. 9 erosion occurs, Sift fences and other control I <br /> it shall be promptly repaired with steps taken to measures will be used where <br /> prevent further occurrence. necessary to control erosion. <br /> Title 14, 17773 Final Cover: (b)A minimum thickness and quality See Title 23,section 2581(a). <br /> of cover material,in accordance with Title 23, <br /> CCR, subchapter 15 section 2581(a),shall be <br /> placed ... as the site reaches final configuration. <br /> Time period not to exceed....15 months... <br /> Title 14, 17779 (a) Slope Protection and Erosion Control:(a)The Erosion control measures will <br /> operator shall develop and implement procedure be utilized as required on the <br /> to protect-final cover-prevent erosion-minimize landfill site. <br /> soil erosion from disturbed areas on site. <br /> Title 14, 17779(d) Slope Protection and Erosion Control:(d) ....slope Erosion control measures will <br /> protection and erosion control methods shall be be included in all partial <br /> implemented pursuant to section 17764... (partial closures. <br /> closure). <br /> r <br /> R.W.Beck and Associates city of Stodwit <br /> 1811.002 <br />