Laserfiche WebLink
SECTION 1 -LANDFILL DCPANSION ISSUES Page 1-16 <br /> Citation Regulation Design Element <br /> CCR 258.21 Cover Material Requirements: Daily cover will consist of a <br /> (a) ... all MSWLF units must cover disposed solid minimum of six inches of <br /> waste with six inches of earthen material at the compacted soil. <br /> end of each operating day... <br /> (b)Alternative materials of an alternative <br /> thickness...may be approved.. <br /> (c)The Director of an approved State may grant a <br /> waiver...extreme seasonal climatic conditions.. <br /> CCR 258.40 (b) Compost liner...flexible membrane liner(FML) .. Composite liner consists of a <br /> and .. at least two-foot layer of compacted soil 60-mil minimum HDPE <br /> with hydraulic conductivity of no more than geomembrane and a two foot <br /> 1 x 10''cm/sec. compacted clay layer with a <br /> maximum hydraulic conductivity <br /> of 1 x 10`7 cm/sec. <br /> CCR 258.60 (a)(1) Closure criteria:The infiltration layer must be A geomembrane final cover <br /> comprised of minimum of 18"of earthen material with an underlying soil layer of <br /> that has a permeability less than of equal to the 18"with maximum permeability <br /> permeability of any bottom liner system or natural of 1 x 10 cm/sec. <br /> subsoils present, or a permeability no greater than <br /> 1 x 10'cm/sec. A June 26, 1992 clarification <br /> discusses the fact that"While this standard does <br /> not explicitly require the use of a synthetic <br /> membrane in the final cover,the Agency <br /> anticipates that if a MSWLF has a synthetic <br /> membrane in the bottom of the unit,then the <br /> infiltration layer in the final cover will, in all <br /> likelihood given today's technologies, include a <br /> synthetic membrane as part of the final cover." <br /> CCR 258.60(a)(2) The erosion layer must consist of a minimum of 6 Soil cover will have a minimum <br /> inches of earthen material that is capable of thickness of twelve inches. <br /> sustaining native plant growth. <br /> CCR 258.60(b) The Director of an approved State may approve Altemative cover not proposed. <br /> an alternative final cover design... <br /> 1.5.2 Daily and Intermediate Cover <br /> Daily and intermediate cover will be obtained primarily from excavation of the horizontal <br /> expansion phases and from the borrow area located north of the existing landfill. As required by <br /> the regulations, the minimum depth of the compacted daily cover is six inches and for the <br /> intermediate cover, the minimum thickness is twelve inches. Daily and intermediate cover <br /> operations are discussed in the Operation Plan. Quantity requirements are discussed In the mass <br /> balance section below. Appendix C also includes a discussion of non-soil daily and intermediate I <br /> cover material. y <br /> It is recommended that on-site soil be used for daily cover until such time that the CIWMB I <br /> approves an alternative cover material. Several tests of alternative covers are being used in <br /> a <br /> I <br /> R.W.Bede and Associates City of Stockton <br /> 1811.002 <br />