My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1996_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
ARCHIVED REPORTS_1996_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:10 PM
Creation date
7/3/2020 10:40:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1996_1
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1996_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
460
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ie <br /> APPENDIX D <br /> STORMWATER DETENTION CALCULATIONS <br /> 1. Introduction <br /> i The purpose of this investigation was to develop a conceptual plan and perform the <br /> preliminary sizing of the Austin Road Landfill stormwater detention facilities to meet San Joaquin <br /> County drainage standards. In accordance with County requirements,the SCS TR-20 hydrologic <br /> computer model was used for the analysis. <br /> Applicable County stormwater standards which apply to the proposed stormwater detention <br /> facilities are included as Attachment A. The major assumption was that the detention pond must <br /> be sized to prevent any increase in peak run-off rates to Little Johns Creek between the current <br /> landfill conditions and the ultimate development of the landfill. The detention pond sizing done <br /> for this analysis was based upon ultimate development of the landfill. <br /> i <br /> County standards specify that detention ponds with gravity outlets need to operate without <br /> 3 backwater conditions. For the Austin Road Landfill to meet this requirement, the bottom of the <br /> pond must be above elevation 36 +/- to be above the FEMA flood elevation of 35. Based upon <br /> preliminary sizing estimates, the pond size needs to provide approximately 15-20 acre-feet of <br /> storage. Providing this much storage above elevation 36 and yet draining the entire site would <br /> be difficult. For example, a pond of approximately 200' x 700' would require a depth of <br /> approximately 7 feet, up to elevation 43. Because much of the site is lower than elevation 43, <br /> this approach was rejected. <br /> As a result, we recommend that the detention pond be constructed at a lower elevation <br /> and employ a pump discharge. Lowering the pond elevation will allow gravity drainage to the <br /> pond from the landfill site. Another method to provide the required on-site storage that was not <br /> considered, yet could be an alternative approach, includes combining the on-site detention <br /> storage with the compensatory flood storage required to relocate Little Johns Creek. This could <br /> be done in such a manner as to prevent any increases in the creek peak flow rates or in the <br /> water surface elevations as a result of relocating the creek and developing the landfill. This <br /> alternative was not considered because analyzing the required storage volume would require a <br /> detailed hydraulic analysis of Little Johns Creek which is beyond the scope of this investigation. <br /> 2. Analysis <br /> s The methodology used in this investigation included two major steps. The first step <br /> involved a determination of the peak flow rate discharging to Little Johns Creek under current <br /> conditions. The second step involved calculating the detention pond's storage volume in order <br /> to maintain the current peak run-off rates once the entire site is developed into a landfill and <br /> capped. <br /> 1 2a. Step 1 - Current Conditions <br /> General Site Conditions <br /> The landfill area topography is illustrated on Figure A. Elevations are generally flat <br /> ranging from approximately 20 feet mean sea level (MSL) in the excavated borrow areas to <br /> approximately 84 feet MSL at the highest point on the waste mass. The area planned for <br />
The URL can be used to link to this page
Your browser does not support the video tag.