My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1996_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
ARCHIVED REPORTS_1996_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:10 PM
Creation date
7/3/2020 10:40:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1996_1
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1996_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
460
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RDSI Matrix <br /> RDSI SECTION REG. CITATION - RESPONSE IREFERENCE <br /> 11I.A.2. Site Plan 14 CCR 18222(e) Final Grading Plan (Pl) shows: Appendix A, <br /> (Legal Boundaries) Record Survey <br /> - Expansion property boundary (also see Record Survey, Appendix Appendix B, <br /> 14 CCR 18222(f) A) CEP Dwg. P1, <br /> (Disposal Areas) - Limits of expanded landfill. CEP Dwg. P2, <br /> - Setback areas and areas not used for landfilling. CEP Dwg. P3, <br /> 14 CCR 18222(8) CEP Dwg. P4 <br /> (Development Appendix T shows proposed permitted boundaries (including legal Appendix T, <br /> Stages) description). Dwg. "Austin Road <br /> Landfill Existing <br /> 14 CCR 18222(h) Phase Development is shown on Drawing P3 and P4 Excavation and and Proposed <br /> (Existing Site Preparation Plan (P2) shows: Permitted <br /> Topography) Boundaries" <br /> - Existing topography. <br /> 11I.A.3. Construction Sequencing <br /> Plans <br /> III.A.3.a. Excavation/Stockpiling 14 CCR 17680 The following drawings show the construction sequence of the landfill: Appendix B, <br /> Plans CEP Dwg. P2 <br /> P2: Excavation and Site Preparation Plan: <br /> - Borrow area (daily/intermediate, final cover). <br /> - Soil stockpiling area (most cell excavation will be used directly as <br /> daily cover and not stockpiled; additional excavation at <br /> construction will be stockpiled). <br /> - Base grades superimposed in pre-disposal topography. <br /> III.A.3.b. Base Preparation/Liner Drawings P3 and P4 show liner contours for each individual phase. Appendix B, <br /> Placement Plans- CEP Dwg. P3, <br /> CEP Dwg. P4 <br /> R.W. Beck 2-6 <br /> Revised October 2, 1997 <br /> City of Stockton <br />
The URL can be used to link to this page
Your browser does not support the video tag.