Laserfiche WebLink
RDSI Matrix <br /> RDSI SECTION REG. CITATION IRESPONSE IREFERENCE <br /> V.D. MATERIALS HANDLING ACTIVITIES <br /> V.D.1. Construction Sequencing Detailed construction sequencing plans for each phase of the landfill Appendix B, <br /> expansion is considered beyond the scope of the conceptual CEP Dwg. P2, <br /> expansion design. Generally for Phases I through IV, the horizontal CEP Dwg. P3 <br /> expansion phases, the phases will be excavated during the landfill <br /> operation to provide daily and intermediate cover material (See CEP <br /> Dwg. P3). An excess material stockpile is shown over the existing <br /> landfill (LF 1)area on CEP Dwg. P2. The vertical expansion, Phases <br /> V through VI, will not require stockpiling of material for development. <br /> The liner grading, waste filling and final grading sequence by <br /> expansion phase is shown on CEP Drawings P3 and P4. <br /> V.D.2. Unloading 14 CCR 17676 Unloading operation procedures will be similar to existing procedures. Appendix H, DEIR <br /> "L" shaped dumping arrangement will be used to minimize blown Pages 11.24 to 11.27 <br /> litter. <br /> V.D.3. Spreading and 14 CCR 17677 Unloading operation procedures will be similar to existing procedures. Appendix H, DEIR <br /> Compacting 14 CCR 17678 Dedicated landfill compactor(CAT 826 C) are currently being used to Page 11.24 to 11.27 <br /> spread and compact waste and will continue to be used in the landfill <br /> expansion. Maximum depth of uncompacted waste will be <br /> approximately 2 feet. Operation slopes on proposed landfill will be <br /> generally less than 10% grade. <br /> R.W. Beck 2-15 <br /> Revised October 2, 1997 <br /> City of Stockton <br />