Laserfiche WebLink
subJect: HAZARDOUS WASTE Category: <br />SAFETY <br />EXCWSIoN PROCEDURE it <br />Effective Date: 3M6194 <br />F. PROCEDURES <br />,. •HANDLINGHAZARDOUS <br />Throughout the waste handling process, the Contractor's site personnel will <br />follow the proper safety procedures forworkerprotection from •!' <br />us <br />The California Regional Water Quality Control Board (CRWQCB), Central Valley <br />Region, California Waste Management Board, and any other. appropriate <br />agencies will be notified by the City of any significant Incidents and <br />responses taken.-- for Notification ResponsibilityIndex. <br />hazardous or other <br />Contractor's site personnel will immediately cordon off the designated <br />areas from • • andsitepersonnel <br />The Contractor notifyDeputy• of <br />Public Works (Solid Waste Division), at 8827, who in turn will be <br />to responsible for assessment, directing and clean-up, transport, and <br />disposal of the wastes. The hazardous wastes will be disposed of by an <br />approved hazardous waste hauler. The incident and response will be <br />recorded <br />•a• - _ records. <br />