My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
COMPLIANCE INFO_1997-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 9:51:55 AM
Creation date
7/3/2020 10:40:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2000
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1998.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RDSI SECTION <br />REG. CITATION <br />RESPONSE I <br />REFERENCE <br />III.A.7. Gas Management Plan <br />14 CCR 18222(m) <br />Currently, a portion of the existing landfill has an active <br />Appendix 1, FDSR <br />extraction system operated by Pacific Energy used to operate <br />Sec. 1.7, Pages 1-28 <br />an electrical generation plant located on facility property. The <br />to 1-29 <br />Pacific Energy facility is shown on Drawing P1. It is proposed <br />Appendix B, <br />that future expansion areas use an active type extraction <br />CEP Dwg. P1, <br />system using a system of gas extraction wells and/or <br />CEP Dwg. P8, <br />collection trenches. A conceptual gas plan by phase <br />CEP Dwg. P9, <br />development is shown on Drawings P9 and P10. <br />CEP Dwg. P10 <br />III.A.8. Groundwater Monitoring <br />14 CCR 18222(1) <br />The current groundwater monitoring program is contained in <br />Appendix K, Water <br />Plan <br />Order No. 96-175, Waste Discharge Requirements For City of <br />Discharge <br />Stockton Austin Road Landfill Facility issued by the California <br />Requirements, Order <br />Regional Water Quality Board. Revisions to the groundwater <br />No. 96-175 <br />monitoring program will require amendments to the RDSI. <br />Appendix <br />CEP Dwg. P1 <br />III.A.9. Representative Cross <br />Five representative landfill cross sections are shown on <br />Appendix B, <br />Sections <br />Drawing P5. These sections show the existing landfill, the <br />CEP Dwg. P5 <br />vertical and horizontal expansion phases, and the final landfill <br />grade. Sections A, B, C, and D are cut north -south through a <br />leachate collection trench and sump for Phases 1, 11, 111, and IV <br />respectively. Section F is cut east -west through Phases 1, 11, <br />III, and IV'showing the drainage slope to the leachate <br />collection trenches, the top of the landfill is shown as a <br />projection beyond the section cut. <br />Sections show specific design elements of the liner, leachate <br />collection system, cover system, surface water system are <br />discussed in Section 1- below. <br />III.A.10. Design Details <br />23 CCR 2542 (Liner <br />Liner Svstem: Liner system is a composite liner consisting of <br />Appendix B, <br />System) <br />a 2 foot clay liner (max. permeability 1 x 10-7 cm/sec) overlaid <br />CEP Dwg. P6 <br />by a geomembrane. For final design, a geosynthetic clay liner <br />Appendix 1, FDSR <br />(GCL) may be substituted for the 2 foot clay liner. See <br />Sec. 1.3.3, Pages <br />Drawing P6 for typical liner details. <br />1-8 to 1-9 <br />14 CCR 17773, <br />Final Cover - Existing Landfill: Final covering existing landfill <br />Appendix B, <br />23 CCR 2581 (Final Cover) <br />areas would consist of a 2 -foot foundation layer and a 1 -foot <br />CEP Dwg. P6 <br />minimum soil barrier (max. permeability 1 x 10-6 cm/sec) with <br />Appendix 1, FDSR <br />a 1 -foot minimum topsoil layer. <br />Sec. 1.5.3 Page 1-17 <br />Final Cover - Expansion Landfill: Final cover for expansion <br />landfill areas will consist of a composite cover system an 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.