Laserfiche WebLink
RDSI SECTION REG. CITATION <br />RESPONSE REFERENCE <br />VI.B.5. Reporting 14 CCR 17705 <br />An amendment will be filed at the time of final design of each Appendix Q <br />phase; this amendment will describe the procedures for <br />submitting results of the monitoring program to the appropriate <br />agencies. Monitoring reports from the existing system are <br />included in Appendix Q. <br />VI.C. NUISANCE CONTROL <br />14 CCR 17701 <br />Current nuisance control practice are discussed in DEIR <br />Appendix H, DEIR <br />Section II for the following: <br />Pages 11.28 to 11.31 <br />- Vector Control <br />- Bird Control <br />- Litter Control <br />- Dust Control <br />- Mud Control <br />- Noise Control <br />VI.D. FIRE CONTROL <br />14 CCR 17703 <br />Conceptual discussions of surface and subsurface fires, <br />Appendix 1, FDSR <br />equipment fires, explosions, and response procedures. An <br />Sec. 2.2.4, Pages 2- <br />amendment will be filed at the time of final design of each <br />19,to 2-21; FDSR <br />phase; this amendment will include the statement that the <br />Sec. 2.6.2.1-2.6.2.3, <br />facility design is in compliance with all state and local fire <br />Pages 2-31 to 2-36 <br />protection agency requirements. <br />VI.E. DUST CONTROL <br />14 CCR 17706 <br />Various activities will be used to minimize fugitive dust; <br />Appendix 1, FD,9mk <br />examples include: watering and dust suppressing chemicals, <br />Sec. 2.2.2, Pag - <br />pavin, minimizing heights from which wastes are dumped, <br />17 <br />lowering vehicle speeds, maintenance of roads, and minimize <br />disturbance of unvegetated areas. <br />VI.F. VECTOR AND BIRD CONTROL <br />14 CCR 17707 <br />Historically, the landfill has not presented a bird problem for <br />Appendix H, DEIR <br />the Stockton Metropolitan Airport. Also, bird populations are <br />Pages 11.28 to 11.31, <br />not expected to increase due to the landfill expansion above <br />III.A.23 <br />current levels. Mitigation measures are discussed in Section <br />III of the DEIR and include compaction and daily coverage of <br />the refuse, proper grading and elimination of stagnant ponds, <br />noise-makers and wind-agitated, reflective tape jor bird <br />