Laserfiche WebLink
TABLE OF CONTENTS (CONT°D) <br /> Page <br /> D. California Air Resources Board: 18 <br /> E. Local Agencies: 18 <br /> VI. CONCEPTUAL DEVELOPMENT PLAN <br /> A. Site capacity and operational life: 19 <br /> B. Earthwork and location of soil borrow pits: 19 <br /> C. Surface drainage, erosion and <br /> sedimentation control: 19 <br /> D. Leachate control and monitoring: 19 <br /> E. Landfill gas control and monitoring: 20 <br /> F. Access and service roads: 20 <br /> G. Liners: 20 <br /> VII. LANDFILL OPERATION <br /> A. Site preparation for next phase of <br /> disposal operation: 21 <br /> B. Landfilling procedures and sequence of <br /> waste cell building: 21 <br /> C. Control of waste: 21 <br /> D. Control of construction work: 22 <br /> E. Control of nuisance and health hazards: 22 <br /> F. Site inspection and maintenance: 22 <br /> G. Monitoring activities: 22 <br /> H. Site management: 23 <br /> 1. Technical division: 23 <br /> 2. Administrative and operating personnel: 23 <br /> 3. Equipment: 24 <br /> 4. Safety: 24 <br />