My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1995_2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1995_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:09 PM
Creation date
7/3/2020 10:41:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1995_2
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_1995_2.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preliminary Postclosure Maintenance Plan <br /> Foothill Sanitary Landfill - Revision #1 May, 1994 <br /> INSPECTIONS <br /> Inspections will be made on a quarterly basis . for the following <br /> items: <br /> Final cover <br /> Final grading, settlement <br /> Drainage system <br /> Gas monitoring and control system <br /> Leachate collection system <br /> Ground water monitoring system <br /> Security <br /> Vector and fire control <br /> Litter control <br /> Sediment control devices <br /> It is assumed that inspections will take a consulting engineer <br /> approximately two working days to complete (16 hours) . The <br /> engineer will probably receive a rate of approximately $70/hour. <br /> The engineer will then prepare a report containing all observed <br /> deficiencies and suggested corrective measures. Each report is <br /> estimated to cost about $1,000. The annual cost for the 5 year <br /> aerial survey is estimated at $500 per year. <br /> 8. COST <br /> ($70 X 8 X 4) + ($500 X 4) + $500 = $4,740 <br /> GAS SYSTEM MAINTENANCE <br /> It is assumed that maintenance of the landfill gas extraction and <br /> control system would require a technician 2 hours per week at <br /> $35/hour to perform routine maintenance checks of the system. <br /> In addition, it is estimated that the technician would require a <br /> full 8 hour day to perform a more thorough maintenance every three <br /> months. <br /> 9. COST <br /> ($35 X 2 X 52) + ($35 X 8 X 4) $4,,760 <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.