Laserfiche WebLink
Filing Project No.20939-004.009 <br /> EMCON/OWT-Sacramento <br /> GROUNDWATE.t-SAMPLING AND ANALYSIS REQUEST FORM <br /> PROJECT NAME : Foothill Landfill <br /> SCHEDULED DATE: July 6, 1999 <br /> Project <br /> SPECIAL INSTRUCTIONS/CONSIDERATIONS: Authorization: Steve Giacomini <br /> 3rd Quarter 1999 Monitoring Event(Quarterly) Project No.: 16037-200.000 <br /> Ground Water. Task Code: 003 <br /> ' Notify Wes Johnson prior to event(209)468-3066 Originals to: Steve Giacomini <br /> cc: <br /> All wells contain dedicated purge and bladder pumps. <br /> ' Installed First Quarter 1998. <br /> Need at least 4"T" cylinders N2. Use logic unit&regulator for cylinders. Well Lock <br /> Make sure to take proper air hose fittings!! Number(s) <br /> 0464 <br /> #18 in caddy <br /> CHECK BOX TO AUTHORIZE DATA ENTRY Site Contact: Jess Padilla (209)887-3969 <br /> Name Phone# <br /> Well Number Casing Casing Depth to <br /> or Source Diameter Length Water ANALYSES REQUESTED <br /> (inches) (feet) (feet) <br /> 4/1/99 <br /> MW_I 5.0 213.4 202.89 TDS <br /> Chlorides- <br /> MW-2 5.0 228.6 220.87 Sulfates <br /> Nitrate-Nitrogen(48-hr hold time) <br /> MW-3 4.0 292.4 267.64 Volatile Organic Compounds by 8260 <br /> RECORD TIME DTW MEASUREMENTS TAKEN! Field Measurements: <br /> RECORD RECHARGE RATE AFTER PURGE. pH,EC,Temp- <br /> USE SOUNDER&MEASURE IN FT/MIN RECHARGE! Turbidity, <br /> ' TAKE SAMPLES TO THE LAB THE SAME <br /> { D Y THEY ARE COLLECTED. <br /> Laboratory and Lab QC Instructions <br /> Sparger Lab Please report MDL's,PQL's and Trace. <br /> 3050 Fite Circle, Sacto <br /> 916-362-8947 <br /> ' Page I of 3 <br />