Laserfiche WebLink
STANDARD OBSERVATIONS <br /> Weekly site inspections have been performed during the second quarter of 1999 and in prior quarters. A <br /> summary of the weekly observations for the quarter can be found on the form in Appendix F. A signature <br /> on the form is the certification that all observations were performed and are accurate. <br /> RUN-OFF/RUN-ON FACILITIES <br /> The Foothill Sanitary Landfill utilizes several methods to control run-on and run-off. The natural <br /> topography of the area works to control any run-on into the site. Also,the working area is a significant <br /> distance from the propertyboundary,so run-on from surrounding properties is minimal. To control run-off, <br /> a perimeter ditch along the north and east ends of the unit direct all storm water run-offinto a sedimentation <br /> basin on the east side of the site. The rest of the run-off from the unit gathers into a temporary <br /> sedimentation basin that is the excavation of a future module. During the second quarter of 1999 there <br /> were no breeches to any of the run-on/run-offfacilities,and they will continue to be monitored in the future. <br /> sAwes\fh\gwmon\2-99rep.wpd <br /> 7 <br />