My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2000_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2000_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 1:51:22 AM
Creation date
7/3/2020 10:41:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2000_8
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2000_8.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD OBSERVATIONS <br /> Weekly site inspections have been performed during the second quarter of 1999 and in prior quarters. A <br /> summary of the weekly observations for the quarter can be found on the form in Appendix F. A signature <br /> on the form is the certification that all observations were performed and are accurate. <br /> RUN-OFF/RUN-ON FACILITIES <br /> The Foothill Sanitary Landfill utilizes several methods to control run-on and run-off. The natural <br /> topography of the area works to control any run-on into the site. Also,the working area is a significant <br /> distance from the propertyboundary,so run-on from surrounding properties is minimal. To control run-off, <br /> a perimeter ditch along the north and east ends of the unit direct all storm water run-offinto a sedimentation <br /> basin on the east side of the site. The rest of the run-off from the unit gathers into a temporary <br /> sedimentation basin that is the excavation of a future module. During the second quarter of 1999 there <br /> were no breeches to any of the run-on/run-offfacilities,and they will continue to be monitored in the future. <br /> sAwes\fh\gwmon\2-99rep.wpd <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.