My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. <br />Daily Field Report Sequence Number. Days left in con1ra14 <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />38 42 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />8-11-03 <br />Monday <br />General Contractor. <br />Liner Contractor: <br />Project Engineer.Reviewed <br />By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Peichoto / Mario Garza <br />Eric Downs <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site Brown sandy silt <br />Clear Warm 940 <br />Frank Dell -Era / JeremyFreas <br />Equipment Utilized: <br />D5CXL Cat Dozer, Case Tractor with laser scraper box, Water Truck, Bomag Smooth Drum roller, John Deere 21 OLE skip loader, <br />31OSE John Deere Backhoe, 140 cat grader, 853H Bobcat, J57 Cleveland Trencher. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 11 Man crew Industrial Fence: 3 Man crew Surveyors group: 2 Man crew <br />Wood Bros. ripped the southeast corner of Module 1 then moisture conditioned and compacted subgrade <br />utilizing the D5CXL, water truck and smooth drum roller. Wood bros. utilized the backhoe to mix bentonite <br />with soil for backfill for the soils gas trench. Wood Bros. backfilled and compacted the northern soils gas <br />trench up the eastern slope. Wood Bros. had laborers placing the bentonite plug for lysimeter #4. Wood Bros. <br />continued to smooth drum roll the northern slope and floor of Module 1. Wood Bros. continued to weld and <br />place the 4" perforated pipe for the soil gas system. Wood Bros. utilized the Case tractor to remove <br />foundation layer material that was over built. Wood Bros. started grading the V ditches to finish grade. <br />Wood bros. started excavating the southern soil gas riser trench utilizing the backhoe. Valley trenching <br />worked on the eastern and southern anchor trench. 0 <br />Surveyors Group continued to check finish grade on the foundation layer and the LCRS V ditches. <br />Industrial fence continued to augured fence postholes utilizing the Bobcat with auger. <br />Vector Engineering, Inc. CQA observed processing, compaction and tested compaction of the foundation <br />layer and subgrade materials placed. CQA performed several density tests with all tests meeting the required <br />specifications. CQA observed pipe welding, geotextile placement and backfill of the soil gas system with <br />3/8" pea gravel. CQA observed installation and tested the bentonite / soil mix. <br />Vector discussed with Wood bros. will continue placement of gravel, welding of pipe and excavation of the soil gas trenches. Wood bros. will <br />MC% and compact the southern slope and the V ditches. D&E will not start liner installation today. Industrial fence wanted to know if the fence <br />was supposed to run straight or turn with the existing fence line. CQA discussed this with the site manager whom wants the fence line to be a <br />straight shot. Industrial fence will have concrete delivered tomorrow. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed Bv: W I <br />
The URL can be used to link to this page
Your browser does not support the video tag.