Laserfiche WebLink
Vector Engineering <br />Daily Field Report <br />jeh N....,1.e.. n:icnll an <br />Project Name: <br />Construction of 2 Landfill Modules- <br />Client Or Manager. r✓ V V - V V <br />County of San Joaquin <br />Daily Field Report Sequence Number. Days left in con <br />52 <br />Foothill Landfill <br />28 <br />Location of Work: <br />Stockton Ca. <br />Owner's Or Client's Representative <br />Date: Day of The Week: <br />Mike Carroll <br />8-29-03 Friday <br />General Contractor. <br />Wood Brothers <br />Liner Contractor: <br />Project Engineer: Reviewed By: <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other <br />Tony Peichoto / Mario Garza <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather <br />CQA Technician: <br />On site Brown sandy silt <br />Clear 940 <br />Frank Dell -Era / Bryan Fritzler <br />Eauinment Utilized <br />-- --- -� <br />Water Truck, DSCXL Cat dozer, TH83 Cat Forklift. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 3 Man crew D&E: 3 Man crew <br />Wood Bros. continued import of Drainage aggregate for the LCRS system from Granites Tracy plant. Wood <br />Bros continued to utilize the D5CXL dozer to spread the material onto the cell floor with a laborer watching <br />for wrinkles. <br />D&E unloaded 1 load of 8 ounce geotextile totaling approximately 331,821 ft2 , 1 load of Bentofix NWL35 <br />totaling approximately 37,224.18$2 and 3 loads of 60mil double textured geomembrane totaling <br />approximately 421,204ft2 . D&E performed repairs to the geomembrane. <br />Vector Engineering, Inc. CQA observed placement of the LCRS drainage aggregate. CQA pulled sieve <br />analysis samples and shipped 1 bucket of LCRS proposed drainage aggregate to Vector Engineering for <br />testing. CQA observed and logged repairs made to the liner. CQA marked and pulled destructive samples on <br />the liner material placed with all tests performed meeting the required specifications for this project. CQA <br />performed 2 sieve analysis and Plasticity Indexes on the proposed operations layer materials. <br />Vector discussed with Wood bros. continue import and placement of LCRS gravel. D&E will perform repairs today. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed <br />