My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�A <br />Vector Engineering <br />Daily Field Report <br />Job Number! n31F.n2_QR <br />Project Name: <br />Client Or Manager <br />Daily Field Report Sequence Number. Days left in contract <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />55 25 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />9-04-03 <br />Thursda <br />General Contractor. <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other <br />Ton Pei oto / Mario Garza <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site Brown sandy silt <br />Clear 980 <br />Frank Dell -Era / GreggHemmen <br />Water Truck, D6LGP Cat dozer, Ingersol Rand Smooth Drum roller, TH83 Cat Forklift, 227 Cat Track forklift. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 5 Man crew D&E: 12 Man crew <br />Wood Bros. continued to grade the Drainage aggregate for the LCRS system utilizing the D6LGP dozer with <br />a laser set-up and a laborer watching for wrinkles. Wood Bros welded 4" perforated LCRS pipe in the <br />northern most V ditch. <br />D&E unloaded 2 loads of Bentofix NWL35 totaling approximately 74,4402 . D&E and Wood Bros prior to <br />installation of liner materials smooth drum rolled the subgrade. D&E continued installation of GCL rolls <br />with a minimum of 351bs peel and 60mil double textured liner. D&E continued to deploy on the Northern <br />and eastern slopes of Module 1. D&E installed a total of 48 panels of GCL totaling approximately 62,670ft2 <br />and 36 panels of geomembrane totaling approximately 66,994ft2 all panels were overlapped and seamed per <br />specifications. D&E performed air tests on some seams with all tests performed meeting the project <br />requirements. D&E performed vacuum tests on repairs performed on the floor of Module 1. D&E placed <br />sandbags as ballast on the liner edges prior to leaving the site. <br />Vector Engineering, Inc. CQA attended the weekly construction meeting. CQA observed grading of LCRS <br />drainage aggregate. CQA observed and logged subgrade acceptance, panel deployment, seaming, repairs, air <br />tests and vacuum tests performed on the liner materials. CQA marked destructive samples on the liner <br />material. CQA walked the liner where the backhoe had traveled on top of the composite materials and <br />marked 2 repairs to be performed by D&E. CQA received a bucket of proposed sump aggregate from Wood <br />Brothers not graded per spec just to show type of material. <br />Vector discussed with Wood bros. cleaned the geocomposite to expose the liner underneath the access ramp so CQA could look for any damage.. <br />Wood Brothers will not have any rubber tired equipment on the liner or drainage aggregate. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed By: <br />
The URL can be used to link to this page
Your browser does not support the video tag.