My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Construction of 2 Landfill Modules- <br />Client Or Manager. Daily Field Report Sequence Number. Days left in cont <br />County of San Joaquin 58 <br />22 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />9-09-03 <br />Tuesday <br />General Contractor. <br />Wood Brothers <br />Liner Contractor. <br />Project Engineer: <br />Reviewed By: <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Peichoto / Mario Garza <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site Brown sandy silt <br />r r.:c__�. <br />Cloudy light rain 81° <br />Frank Dell -Era /Gregg Hemmen <br />..yuayaua,m v1.ulGga. _.-. <br />Water Truck, D6LGP Cat Dozer, D5CXL Cat Dozer, Ingersol Rand Smooth Drum roller, TH83 Cat Forklift, 227 Cat Track forklift <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 6 Man crew D&E: 12 Man crew <br />Wood Bros. imported drainage aggregate material from Granites Tracy plant utilizing 18 transfer trucks. <br />Wood bros continued to grade the Drainage aggregate for the LCRS system utilizing the D6LGP and <br />D5CXL dozers with laser set-up and a laborer watching for wrinkles. Wood Bros continued to weld the 4" <br />perforated LCRS pipe on the floor of Module 1. <br />D&E unloaded 1 load of Bentofix NWL35 totaling approximately 37,224ft2. D&E prior to installation of <br />liner materials smooth drum rolled the subgrade. D&E continued installation of GCL rolls with a minimum <br />of 35lbs peel and 60mi1 double textured liner. D&E continued to deploy on the eastern slope of Module 1. <br />D&E installed a total of 28 panels of GCL totaling approximately 45,015ft2 and 4 panels of geomembrane <br />Is <br />totaling approximately 44,572ft2 all panels were overlapped and seamed per specifications. D&E performed <br />air tests on some seams. D&E airtested successfully several seams. D&E performed repairs CQA marked <br />during walk through on 9-8-03. D&E placed sandbags as ballast on the liner edges prior to leaving the site. <br />Vector Engineering, Inc. CQA observed grading and pulled a construction sample for testing on the LCRS <br />drainage aggregate imported today. CQA performed 4 #200 washes on the drainage aggregate. CQA <br />observed and logged subgrade acceptance, panel deployment, seaming, repairs and air tests performed on the <br />liner materials. CQA marked destructive samples on the liner material placed. CQA set-up 2 Plasticity <br />Indexes and sieve analysis tests on the proposed operations material. <br />Vector discussed with Wood bros the liner and V ditches need to be cleaned of all soils prior to placement of any drainage aggregate in the <br />middle section of Module 1. Wood bros. talked with Granites plant manager about <br />• <br />File Name: Foothill Landfill Prepared BY: Frank Dell-EraReviewed B <br />
The URL can be used to link to this page
Your browser does not support the video tag.