Laserfiche WebLink
Vector Engineering <br />Daily Field Report <br />Job Number: 03160100 <br />Project Name: <br />Client Or Manager: <br />Daily Field Report Sequence Number. Days left in contme <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />76 4 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />10-03-03 <br />F 'da <br />General Contractor. <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Fritzler <br />General Foreman: <br />Liner Superintendent: <br />-Bryan <br />Other <br />Ryan Wood <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Brown sandy silt <br />Gnui,.mo.,r i TIA,' -A• <br />Clear 880 <br />Frank Dell -Era / Nathan DeWitt <br />1.ja't`er* <br />Truck, D6LGP Cat Dozer, D5CXL Cat dozer, Ingersol Rand Smooth Dnun roller, TH83 Cat Forklift, 227 Cat Track forklift <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 7 Man crew D&E: 11 Man crew <br />Wood Bros. imported drainage aggregate material from Granites Tracy plant utilizing 15 transfer and end <br />dump trucks. Wood Bros continued to grade the Drainage aggregate for the LCRS system utilizing the <br />D6LGP with a laser set-up and a laborer watching for wrinkles. Wood Bros continued placement of <br />operations on the northwest portion of Module 1. Wood Bros placed the gravel around the 12" secondary <br />riser pipe to the top of trench. Wood Bros had a second 623 delivered to the site today. <br />D&E deployed and sewed 162'000ft2 of filter geotextile off the western edge of Module 1. D&E performed <br />air tests and vacuum tested repairs all over the site today. D&E performed general clean-up. <br />11 <br />Vector Engineering, Inc. CQA observed placement and pulled a sample of the LCRS drainage aggregate <br />imported today. CQA ran a sieve analysis on the drainage aggregate. CQA observed and logged air tests and <br />vacuum testing performed on the liner. CQA marked and pulled 5 destructive samples for conformance <br />testing. With DS#148 failing the peel portion of the test. D&E was off site, CQA will inform them on <br />Monday. <br />Vector discussed with Wood Bros. continue to haul 3/8" pea gravel, fill in secondary trench with gravel, bring in another scrape today.. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed <br />