Laserfiche WebLink
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager <br />Daily Field Report Sequence Number. Days left in cont <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />106 -26 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />11-14-03 <br />F *da <br />General Contractor. <br />Liner Contractor <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Mark Ceolho <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Brown san4y silt <br />Cloudy 590 <br />Frank Dell -Era / Nathan DeWitt <br />Equipment Utilized: <br />Water Truck, 2- D6LGP Cat Dozers, 2-623 Cat Paddle wheel scra ers, 227 Cat Posi track forklift. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 10 Man crew <br />Wood Bros. continued to haul and place operations material from stockpile 2 utilizing 2- 623 scrapers and <br />2- D6 dozers with 2- laborers. Wood bros. continued to compact the anchor trenches around Module 1. <br />Wood Bros. placed the 2nd layer of geotextile in the sump area. <br />D&E deployed a total of approximately 12'000ft2 of geotextile around the interceptor structure and sump <br />area. <br />Con J Franke electrician on site working on electrical conduit to leachate control panel box. <br />Vector Engineering, Inc. CQA observed and checked seams of geotextile material placed today. CQA 40 <br />observed spreading of operations material up the eastern slope. CQA performed 1 sieve analysis on the <br />operations material. CQA performed density tests on the compacted anchor trench. <br />Vector discussed with Wood Bros CQA would like to see a row of sandbags placed around the sump to help protect from silts getting into the <br />sump if a big rain hits this weekend. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed By: <br />