My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager <br />Daily Field Report Sequence Number. Days left in cont <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />106 -26 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />11-14-03 <br />F *da <br />General Contractor. <br />Liner Contractor <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Mark Ceolho <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Brown san4y silt <br />Cloudy 590 <br />Frank Dell -Era / Nathan DeWitt <br />Equipment Utilized: <br />Water Truck, 2- D6LGP Cat Dozers, 2-623 Cat Paddle wheel scra ers, 227 Cat Posi track forklift. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 10 Man crew <br />Wood Bros. continued to haul and place operations material from stockpile 2 utilizing 2- 623 scrapers and <br />2- D6 dozers with 2- laborers. Wood bros. continued to compact the anchor trenches around Module 1. <br />Wood Bros. placed the 2nd layer of geotextile in the sump area. <br />D&E deployed a total of approximately 12'000ft2 of geotextile around the interceptor structure and sump <br />area. <br />Con J Franke electrician on site working on electrical conduit to leachate control panel box. <br />Vector Engineering, Inc. CQA observed and checked seams of geotextile material placed today. CQA 40 <br />observed spreading of operations material up the eastern slope. CQA performed 1 sieve analysis on the <br />operations material. CQA performed density tests on the compacted anchor trench. <br />Vector discussed with Wood Bros CQA would like to see a row of sandbags placed around the sump to help protect from silts getting into the <br />sump if a big rain hits this weekend. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed By: <br />
The URL can be used to link to this page
Your browser does not support the video tag.