Laserfiche WebLink
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. Daily Field Report Sequence Number. Days left in cont <br />Construction of 2 Landfill Modules- <br />County of San Joaquin 12 68 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />7-3-03 <br />General Contractor. <br />Liner Contractor: <br />-Thursday <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other <br />Tony Peichoto / Mario Garza <br />Eric Downs <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site tan Brown sandy silt <br />Clear Warm 96° <br />Frank Dell -Era / Jeremy Freas <br />Equipment Utilized: <br />2-631 C Cat Scraper, D9G Dozer, D6 Cat Dozer with disc, 825 Sheepsfoot Cat compactor, Water Truck. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 7 Man crew <br />Wood Bros. continued to excavate unsuitable materials and process foundation layer material, to check depth <br />of the excavation utilizing a laser. Wood Bros. hauled and placed material from the processing pad to the <br />second bay off the north slope utilizing the D9 dozer and 2-631 scrapers. Wood brothers utilized the water <br />truck and the D6 with disc to moisture condition the foundation layer material placed in the northwest corner <br />of Module 1. Wood Brothers had a second water truck arrive on site to start Monday. <br />Vector Engineering, Inc. CQA attended the weekly construction meeting. CQA observed excavation of <br />unsuitable materials from the floor of Module 1. CQA observed checking of excavated depth utilizing a laser <br />set-up. CQA observed processing and compaction of foundation layer material. CQA performed density tests <br />on the compacted foundation layer material with all tests meeting the required specifications pending <br />moisture checks. CQA performed 2 -washes, 3- sieve analysis and 2 moisture density relationship curves. <br />CQA set-up 2 -washes and 1 sieve analysis. <br />Vector discussed with Wood bros. a second water truck will be on site Monday. Wood Bros. will start moisture conditioning the foundation layer <br />material in the northwest corner of Module I for compaction testing. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed By: <br />