Laserfiche WebLink
CTOR <br />ENGINEERING, NC. <br />Gress Valley, <br />CA s Howe, TX s Mk Arptina a Pas s &Jippina <br />11131 Rtati�e, G ir'� CA 133 <br />START-UP(TRIAL) WELD LOG <br />�: (330)1111111 fit; (S38) 271d33i <br />Project Name:. <br />Foothill Landfill <br />Project Ni 031602.00.02 <br />Material <br />60mil Double textured <br />[x ] Primary (] Secondary (] Other <br />Sample <br />Date <br />Tlme <br />Operator <br />Machine <br />Extrusion/ <br />Temp. <br />mlpmeemdmAmb. <br />Peel <br />Shear <br />Failure Pasa <br /># <br />am/am <br />Name <br />No. <br />Fusion <br />Tem <br />Mode Fail <br />37 <br />8/28/03 <br />m <br />CL <br />68 <br />Fusion <br />850 <br />500 <br />90 <br />158/131-109/127 <br />148-148 <br />FTB Pass <br />38 <br />8/29/03 <br />am <br />AS <br />1 <br />Extrusion <br />00/400 <br />NA <br />55 <br />146-154 <br />168-173 <br />FTB Pass <br />39 <br />9/2/03 <br />am <br />FD <br />11 <br />Fusion <br />850 <br />400 <br />68 <br />146/137-141/145 <br />170-161 <br />FTB Pass <br />40 <br />9/2/03 <br />am <br />CL <br />68 <br />Fusion <br />850 <br />400 <br />68 <br />120/146-124/144 <br />167-173 <br />FTB Pass <br />41 <br />9/2/03 <br />am <br />AS <br />1 <br />Extrusion <br />500/400 <br />NA <br />68 <br />138-122 <br />148-148 <br />FTB Pass <br />42 <br />9/2/03 <br />m <br />FD <br />11 <br />Fusion <br />850 <br />500 <br />94 <br />145/147-135/135 <br />160-155 <br />FTB Pass <br />43 <br />9/2/03 <br />m <br />AS <br />1 <br />Extrusion <br />500/350 <br />NA <br />94 <br />135-147 <br />148-147 <br />FTB Pass <br />44 <br />9/2/03 <br />m <br />CL <br />68 <br />Fusion <br />850 <br />450 <br />94 <br />145/139-109/139 <br />143-138 <br />FTB Pass <br />45 <br />9/3/03 <br />am <br />FD <br />11 <br />Fusion <br />850 <br />400 <br />68 <br />144/148-148/142 <br />182-170 <br />FTB Pass <br />46 <br />9/3/03 <br />am <br />CL <br />68 <br />Fusion <br />850 <br />400 <br />68 <br />137/137-125/127 <br />163-159 <br />FTB Pass <br />47 <br />9/3/03 <br />m <br />FD <br />11 <br />Fusion <br />850 <br />550 <br />85 <br />120/122-117/123 <br />149-151 <br />FTB Pass <br />48 <br />9/3/03 <br />m <br />CL <br />68 <br />Fusion <br />850 <br />450 <br />85 <br />125/124-125/123 <br />135-146 <br />FTB Pass <br />49 <br />9/3/03 <br />m <br />AS <br />1 <br />Extrusion <br />500/350 <br />NA <br />85 <br />103-105 <br />133-146 <br />FTB Pass <br />50 <br />9/4/03 <br />am <br />FD <br />11 <br />Fusion <br />850 <br />450 <br />63 <br />146/142-146/149 <br />167-169 <br />FTB Pass <br />51 <br />9/4/03 <br />am <br />AS <br />1 <br />Extrusion <br />500/400 <br />NA <br />L 63 <br />128-139 <br />156-158 <br />FTB Pass <br />52 <br />9/4/03 <br />am <br />CL <br />68 <br />Fusion <br />850 <br />360 <br />64 <br />148/122-132/130 <br />165-164 <br />FTB Pass <br />53 <br />9/4/03 <br />m <br />FD <br />11 <br />Fusion <br />850 <br />550 <br />88 <br />115/119-127/130 <br />155-152 <br />FTB Pass <br />54 1 <br />9/4/03 <br />m <br />CL 1 <br />68 <br />Fusion <br />850 <br />450 <br />88 <br />112/130-128/12$ <br />153-152 <br />FTB Pass <br />Minimum Requirements <br />Peel <br />78 ppi <br />Reviewed By; <br />Shear <br />120 ppi <br />