Laserfiche WebLink
T IV <br />ECT <br />ENGINEERING, INC, <br />GUVdley, CA a Haft TX . Mk # Argon # Peng # Pbilippim <br />START-UP(TRIAL) WELD LOG /N8Lon Smk,s&C G= l&, CA ONS tA- (BO)272-UN )k (s*2n4BJ <br />Project Name% Foothill Landfill Project Ni 031602.00.02 <br />Material 60mil Double textured [x ] Primary [ ] Secondary [ ]Other <br />Sample <br /># <br />Date <br />Time <br />am/pm <br />Operator <br />Name <br />Machine <br />No. <br />Extrusion/ <br />Fusion <br />Temp, <br />Speed <br />Amb. <br />Temp <br />Peel <br />Shear <br />Failure <br />Mode <br />Pass/ <br />Fail <br />91 <br />9/22/03 <br />am <br />CL <br />68 <br />Fusion <br />850 <br />450 <br />75 <br />121/119-118/123 <br />154-155 <br />FTB <br />Pass <br />92 <br />9/22/03 <br />am <br />AS <br />1 <br />Extrusion <br />500/350 <br />NA <br />75 <br />121-121 <br />151-149 <br />FTB <br />Pass <br />93 <br />9/22/03 <br />am <br />FD <br />11 <br />Fusion <br />850 <br />550 <br />75 <br />120/117-130/129 <br />146-140 <br />FTB <br />Pass <br />94 <br />9/22/03 <br />FD <br />11 <br />Fusion <br />850 <br />600 <br />95 <br />120/119-121/117 <br />146-149 <br />FTB <br />Pass <br />95 <br />9/22/03 <br />m <br />CL <br />68 <br />Fusion <br />850 <br />500 <br />95 <br />124/120-123/117 <br />153-155 <br />FTB <br />Pass <br />96 1 <br />9/22/03 <br />Pm <br />AS I <br />1 <br />Extrusion <br />500/350 <br />NA <br />95 <br />134-135 <br />149-150 <br />FTB <br />Pass <br />97 <br />9/23/03 <br />am <br />FD <br />1 <br />Fusion <br />850 <br />550 <br />69 <br />135/141-141/132 <br />167-169 <br />FTB <br />Pass <br />98 <br />9/23/03 <br />am <br />CL <br />68 <br />Fusion <br />850 <br />450 <br />69 <br />137/135-139/141 <br />157-160 <br />FTB <br />Pass <br />99 <br />9/23/03 <br />Prn <br />FD <br />11 <br />Fusion <br />850 <br />600 <br />90 <br />114/117-120/122 <br />153-152 <br />FTB <br />Pass <br />100 <br />9/23/03 <br />m <br />CL <br />68 <br />Fusion <br />850 <br />500 <br />90 <br />117/122-121/126 <br />143-141 <br />FTB <br />Pass <br />101 <br />9/23/03 <br />m <br />AS <br />1 <br />Extrusion <br />500/350 <br />NA <br />90 <br />130-132 <br />142-145 <br />FTB <br />Pass <br />102 <br />9/24/03 <br />am <br />FD <br />11 <br />Fusion <br />850 <br />500 <br />70 <br />123/132-127/124 <br />165-170 <br />FTB <br />Pass <br />103 <br />9/24/03 <br />am <br />AS <br />1 <br />Extrusion <br />500/350 <br />NA <br />70 <br />133-130 <br />157-160 <br />FTB <br />Pass <br />104 <br />9/24/03 <br />pm <br />FD <br />11 <br />Fusion <br />850 <br />550 <br />80 <br />129/126-124/127 <br />153-155 <br />FTB <br />Pass <br />105 <br />9/25/03 <br />am <br />FD <br />11 <br />Fusion <br />850 <br />400 <br />60 <br />126/146-162/147 <br />188-189 <br />FTB <br />Pass <br />106 <br />9/25/03 <br />am <br />CL <br />68 <br />Fusion <br />850 <br />400 <br />60 <br />156/141-155/143 <br />184-187 <br />FTB <br />Pass <br />107 <br />9/25/03 <br />am <br />AS <br />1 <br />Extrusion <br />500/400 <br />NA <br />70 <br />129-127 <br />179-177 <br />1 FTB <br />Pass <br />108 <br />9/25103 <br />am <br />FD <br />11 <br />Fusion <br />850 <br />500 <br />70 <br />136/127-145/127 <br />184-188 <br />FTB <br />Pass <br />rvnnonurn nequiremenrs <br />Peel 78 ppi Reviewed By; At <br />Shear 120 ppi <br />