My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Prepared subgrade (for excavated slopes) or approximately 4-ft thick foundation layer (for <br /> interface liner); <br /> • Needlepunched reinforced geosynthetic clay liner(GCL); <br /> • 60-mil, single-sided textured HDPE geomembrane(textured side placed against GCL); <br /> • Geocomposite drainage net(GDN); <br /> • One-foot thick protective operations layer to be placed concurrently with waste placement <br /> (maximum height of operations layer at any given time is 10 ft above refuse level) <br /> The northeastern portion of WMU FU-04 liner and LCRS consists of, from bottom to top: <br /> • Existing minimum 2-foot thick foundation layer compacted to a minimum 90 percent relative <br /> compaction(based on ASTM D1557); <br /> • Existing minimum 1-foot thick compacted clay liner with a maximum field hydraulic <br /> conductivity of 1 x 10-6 cm/sec; <br /> • Existing minimum 1-foot thick vegetative layer. Vegetation will be stripped; <br /> • Nonwoven geotextile filter fabric; <br /> • One half-foot thick blanket gravel and pipe network drainage layer with a minimum hydraulic <br /> conductivity of 0.1 cm/sec; <br /> • Nonwoven geotextile filter fabric; <br /> • One-foot thick protective operations layer <br /> The liner and LCRS in the transition zone between the toe of the WMU ART-03 southern refuse <br /> slope and the northern WMU FU-03 top of slope consists of,from bottom to top: <br /> • Geogrid; <br /> • 60-mil, double-sided textured HDPE geomembrane liner; <br /> • Cushion geotextile; <br /> • One half-foot thick gravel blanket drainage layer with a minimum hydraulic conductivity of <br /> 0.1 cm/sec; <br /> • Nonwoven geotextile filter fabric; <br /> • One half-foot thick general earthfill; <br /> • Needlepunched reinforced geosynthetic clay liner(GCL); <br /> • 60-mil, single-sided textured HDPE geomembrane (textured side placed against GCL); <br /> • Geocomposite drainage net(GDN); <br /> • One-foot thick protective operations layer <br /> FU-04 REPORT.DOC 5-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.