r <br /> NOTES: <br /> FILTER <br /> GEOTEXTILE PROTECTIVE OPERATIONS LAYER 18-INCH NONPERFORATED SEE NOTE 4 1. PROVIDE EXTRA 1 FOOT OF COVER OVER RISER PIPE. <br /> HDPE RISER PIPE <br /> GRANULAR DRAINAGE MATERIAL 2. PLACE BOLLARDS AROUND END OF RISER PIPE FOR PROTECTION FROM TFAFFIC. <br /> 60-mil SINGLE TEXTURED SEE NOTE 3 FLANGE CAP v <br /> HDPE GEOMEMBRANE 3. PLACE TWO ADDITIONAL SHEETS OF CUSHION GEOTEXTILE BELOW LEACHATE RISER PIPE <br /> GEOCOMPOSITE TO PROTECT GECOMPOSITE DRAINAGE NET. <br /> GEOSYNTHETIC CLAY LINER DRAINAGE NET <br /> 60-mil DOUBLE GENERAL EARTHFILL1' MIN 4. CONTRACTOR TO PROVIDE RISER GUIDE TO PREVENT LATERAL PIPE MOVEMENT <br /> SEE NOTE 1 BUT PERMITTING EXPANSION/CONTRACTION. [� <br /> TEXTURED HOPE COARSE GRAVEL ®® <br /> GEOMEMBRANE v <br /> 5. PERFORATION PATTERN: 1/2-INCH HOLES AT PIPE FOURTH POINTS, SPACED n <br /> 6-INCHES ON CENTER. <C <br /> CUSHION <br /> m <br /> GEOTEXTILE 5' MIN ® 6. USE HDPE BOOT TO ALLOW PENETRATION OF LYSIMETER PROTECTIVE CASING o <br /> /® NOTE 6 OR RISER PIPE THROUGH GEOSYNTHETICS. <br /> 1 MIN _ - _ _ - - - _ _ - - ��® 7. OFFSET PRIMARY AND SECONDARY RISER PIPES BY APPROXIMATELY 5-FT (HORIZONTAL). <br /> 18-INCH NONPERFORATED <br /> •o. o. bo. o.: v .y e. o. :o o y. o <br /> 1 MIN Qma Q.:a Q. .e<O.:c a <br /> �0' 00: 0`' — ®® HDPE LEACHATE RISER PIPE 8. USE SINGLE SIDE TEXTURED HDPE GEOMEMBRANE WITH TEXTURED SIDE <br /> a O o 0 0 0 0 0 0 0 0 0 0 0 ,�✓ PLACED AGAINST GEOSYNTHETIC CLAY LINER. <br /> 2°MIN , <br /> a o 0 0 0 0 0 o 0 0 0 0 0 0 �i CUSHION C <br /> ®�(/ � GEOTEXTILE 9. BELOW APPROX. ELEVATION 35', THE MATERIAL UNDERLYING THE INTERFACE LINER IS _o <br /> EITHER NATIVE GROUND OR GENERAL EARTH FILL AND NO SUBGRADE FILL IS REQUIRED. <br /> ------ N <br /> 5' MIN - � a � o—o - o 0 0 0 --- � (SEE NOTE 3) > <br /> WELD ° ° ° ° ° °4491m 10. OWNER SHALL PLACE A PROTECTIVE PLASTIC COVERING OVER THE GEOCOMPOSITE <br /> domm GEOCOMPOSITE DRAINAGE NET. THE PROTECTIVE PLASTIC COVERING SHALL BE REMOVED (BY OWNER) <br /> CLAY LINER ` DRAINAGE NET <br /> 60-mil SINGLE TEXTURED \ BEFORE THE SIDE SLOPE OPERATIONS LAYER IS PLACED AGAINST THE GEOCOMPOSITE <br /> HDPE GEOMEMBRANE' ` �� DRAINAGE NET. THE SIDE SLOPE PROTECTIVE OPERATIONS LAYER SHALL BE PLACED IN Q <br /> GEOSYNTHETIC 18" HDPE LONG ` CONJUNCTION WITH WASTE PLACEMENT (BY OWNER)TO A MAXIMUM HEIGHT OF 10'ABOVE <br /> CLAY LINER RADIUS ELBOW ` v�sf THE LEVEL OF REFUSE. THE OWNER SHALL PLACE THE SIDE SLOPE OPERATIONS LAYER N <br /> USING A WHEELED LOADER, WITH NO EQUIPMENT LOADING ON THE SLOPE. OWNER SHALL Q) <br /> CUSHION PROVIDE TEMPORARY ANCHORING OF PROTECTIVE PLASTIC COVERING. TEMPORARY <br /> GEOTEXTILE 60-mil SINGLE TEXTURED GEOSYNTHETIC ANCHORAGE SHALL NOT DAMAGE UNDERLYING LINER. E <br /> HDPE GEOMEMBRANE CLAY LINER <br /> (NOTE 8) V) <br /> 18-INCH PERFORATED <br /> HDPE LEACHATE RISER PIPE \ SECTION - PRIMARY LEACHATE RISER PIPE Q 00W/FLANGE CAP <br /> (SEE NOTE 5) \ \ 1 N <br /> \ 18-INCH NONPERFORATED U Z aN I <br /> \ HDPE RISER PIPE Z V) Q co <br /> CUSHION `� U <br /> TEXTILE <ECTION (SEE NOTE 3) r ~ U 0 <br /> LEACHATE RISER AND SUMP SHT 4 a O Iw- <br /> NTS (SEE NOTE 2, 7) LL In Z IliQ o <br /> 0 -r- <br /> -- --- a- <br /> GEOCOMPOSITE r <br /> 60-mil SINGLE TEXTURED DRAINAGE NET O <br /> GEOSYNTHETIC l'F , f- a <br /> HDPE GEOMEMBRANE , � i <br /> (NOTE 8) CLAY LINER r rLr, > ,`. :sG � a <br /> PROTECTIVE OPERATIONS LAYER fto <br /> O N <br /> GRANULAR DRAINAGE MATERIAL , ?? _ -- a <br /> FILTER fi i i,= o <br /> FILTER TILE 60-mil SINGLE TEXTURED <br /> HDPE GEOMEMBRANE (NOTE 8) <br /> PROTECTIVE w o <br /> GEOSYNTHETIC CLAY LINER VAULT BOX <br /> GENERAL EARTHFILL (TRAFFIC RATED) <br /> s Z94 d <br /> ss o a <br /> COARSE GRAVEL - J 1 <br /> VARIES EXISTING GRADE o <br /> 60-mil DOUBLE TEXTURED <br /> HDPE GEOMEMBRANE J S <br /> (VARIES) 'Z II <br /> 6" PERFORATED <br /> 60 mil SINGLE <br /> HDPE LEACHATE , _ TEXTURED HDPE <br /> f -o <br /> COLLECTION PIPE SEE NOTE 6 ; ' GEOMEMBRANE v s <br /> - <br /> THICKNESS VARIES FROM (SEE NOTE 8) <br /> 9 MIN U <br /> APPROX 1-FT TO <br /> 5-FT GEOSYNTHETIC <br /> Ll <br /> 0 0 o a a a o 0 0 SUBGRADE FILL \\\ CLAY LINER <br /> o EXISTING AUSTIN ROAD <br /> 2' MIN ° ° LANbFiLL COVER <br /> GEOCOMPOSITE w <br /> DRAINAGE NET AND REFUSE w <br /> CUSHION — 00 0 o a (SEE NOTE 9 <br /> GEOTEXTILE 5 MIN o 0 0 0 / \ ) J J J <br /> c fo <br /> Q <br /> WELD LYSIMETER LEADS \ o <br /> 60-mil SINGLE TEXTURED AND PROTECTIVE CASING � z �- w <br /> CLAY LINER HDPE GEOMEMBRANE ETAI L 11 J p <br /> (NOTE 8) z 60-mil SINGLE TEXTURED a- o <br /> GEOSYNTHETIC POROUS HDPE GEOMEMBRANE INTERFACE LINER DETAIL SHT 3 m. mi Q <br /> CLAY LINER - NTS of O <br /> SUCTION CUP <br /> CUSHION LYSIMETER 3: z <br /> GEOTEXTILE GEOSYNTHETIC CLAY LINER Ir z <br /> 00 <br /> �_ <br /> LL <br /> LL <br /> SECTION L <br /> TYPICAL SUMP AND LYSIMETER SHT 4 <br /> NTS <br /> QROFEsSt <br /> P'' S � <br /> a No. 22631 m <br /> Exp. 12-31-05 �+ <br /> Sheet$of 10 <br /> ` � <br /> IV I `� Rev <br />