Laserfiche WebLink
INTERFACE LINER <br /> SLOPE REINFORCEMENT DESIGN FOR SLOPES STEEPER THAN 6•1 <br /> WMU FU-04,FORWARD,INC.LANDFILL <br /> PROBLEM: <br /> Estimate the thickness of subgrade fill required to support the WMU FU-04 interface liner on the south <br /> facing former Austin Road Landfill slope and the south facing WMU ART-03 slope. <br /> GIVEN: <br /> These calculations were previously performed for the WMU D-94,D-97,D-98,D-99,and FU-03 designs. <br /> Since the interface slope liner and LCRS components are approximately the same as for the previous <br /> designs,the methodology used in the previous calculations is applicable to the WMU FU-04 design. <br /> The methodology presented in Jang and Montero(1993)estimates the required subgrade fill thickness to <br /> bridge a 3 ft by 3 ft by 6 ft void under the liner system. The dimensions of the void were estimated by <br /> assuming a worst case scenario of an item as large as a refrigerator collapsing directly under the lining <br /> system. <br /> SUMMARY: <br /> 1. For the 5:1 Austin Road Landfill slope,the subgrade fill thickness should be approximately 4-ft. <br /> 2. For the 3:1 WMU ART-03 slope,the subgrade fill thickness should be approximately 4-ft. <br />