My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 3:43:09 AM
Creation date
7/3/2020 10:42:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2005
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
708
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Unit Requirements for N-4070-1-2 (continued) Page 3 of 3 <br />16. This operating permit may be cancelled with APCO approval when the landfill is closed, pursuant to the requirements <br />of this permit, if the landfill is not otherwise subject to the requirements of either 40 CFR part 70 or part 71 and if <br />either 1) it was never subject to the requirement for a control system under 40 CFR 60.752(b)(2); or 2) the owner or <br />operator meets the conditions for control system removal specified in 40 CFR 60.752(b)(2)(v). [40 CFR 60.752(d) and <br />62.14352(f)] Federally Enforceable Through Title V Permit <br />17. If the landfill is permanently closed, a closure notification shall be submitted to the APCO within 30 days of este <br />disposal cessation. A permanent closure must take place in accordance with 40 CFR 258.60. If a closure report has <br />been submitted, no additional waste may be placed in the landfill without filing a notification of modification to the <br />APCO, pursuant to 40 CFR 60.7(a)(4). [40 CFR 60.752(b)(1)(ii)(B), 60.757(d) and 62.14352(f)] Federally Enforceable <br />Through Title V Permit <br />18. If the calculated NMOC is equal to or greater than 50 megagrams/year, the owner or operator shall install a collection <br />and control system, that effectively captures the gas generated within the landfill, within 30 months of that <br />determination. This operating permit must be modified accordingly to show compliance with 40 CFR 62, Subpart <br />GGG requirements applicable to a MSWL with a collection and control system. [40 CFR 60.752(b)(2)(ii), 60.753, <br />60.755, 60.756, 62.14353 and 62.14354] Federally Enforceable Through Title V Permit <br />19. If a gas collection and control system is installed, it shall comply with the operational standards of 40 CFR 60.7 53, the <br />compliance provisions of 40 CFR 60.755, the monitoring provisions of 40 CFR 60.756, the reporting and record <br />keeping requirements of 40 CFR 60.757 and 60.758, and the requirements of 40 CFR 60.759 (for active collection <br />systems). [40 CFR 60.752(b)(2)(ii), 60.753, 60.755, 60.756, 60.757, 60.758, 60.759, 62.14353 and 62.14354(b)] <br />Federally Enforceable Through Title V Permit <br />20. Permittee shall comply with the Increments of Progress as defined in Table 3 of 40 CFR 62, Subpart GGG, unless a <br />site specific schedule is approved by EPA, which includes notification of EPA no later than 10 business days after <br />completing each increment of progress. [40 CFR 62.14355(b)] Federally Enforceable Through Title V Permit <br />1. Permittee shall submit the Final Control Plan (as defined in 40 CFR 62.14351) one year after the first annual emission <br />rate report showing NMOC emissions > 50 megagrams/year, unless a site-specific schedule is approved by EPA. <br />(Increment 1) [40 CFR 62.14356(a)(1)] Federally Enforceable Through Title V Permit <br />22. Permittee.shall Award Contract(s) (as defined in 40 CFR 62.14351) on or before December 6, 2001, or 20 months after <br />the first annual emission rate report showing NMOC emissions > 50 megagrams/year, unless a site-specific schedule is <br />approved by EPA. (Increment 2) [40 CFR 62.14356(x)(2)] Federally Enforceable Through Title V Permit <br />23. Permittee shall Initiate On -Site Construction (as defined in 40 CFR 62.14351) on or before April 6, 2002, or 24 months <br />after the first annual emission rate report showing NMOC emissions > 50 megagrams/year, unless a site-specific <br />schedule is approved by EPA. (Increment.3) [40 CFR 62.14356(x)(3)] Federally Enforceable Through Title V Permit <br />24. Permittee shall Complete On -Site Construction (as defined in 40 CFR 62.14351) on or before October 6, 2002, or 30 <br />months after the first annual emission rate report showing NMOC emissions > 50 megagrams/year, unless a site- <br />specific schedule is approved by EPA. (Increment 4) [40 CFR 62.14356(a)(4)] Federally Enforceable Through Title V <br />Permit <br />25. Permittee shall Achieve Final Compliance (as defined in 40 CFR 62.14351) on or before October 6, 2002, or 30 <br />months after the first annual emission rate report showing NMOC emissions > 50 megagrams/year, unless a site- <br />specific schedule is approved by EPA. (Increment 5) [40 CFR 62.14356(a)(5)] Federally Enforceable Through Title V <br />Permit <br />26. Permittee must conduct initial performance tests of the landfill gas collection system and air pollution control <br />equipment on or before April 4, 2003, or 30 months and 180 days after the first annual emission rate report showing <br />NMOC emissions > 50 megagrams/year, unless a site-specific schedule is approved by EPA. [40 CFR 62.14356(a)(5)] <br />Federally Enforceable Through Title V Permit <br />These terms and conditions are part of the Facility -wide Permit to Operate. <br />Facility Name: FOOTHILL SANITARY LANDFILL <br />
The URL can be used to link to this page
Your browser does not support the video tag.