My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 3:43:09 AM
Creation date
7/3/2020 10:42:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2005
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
708
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v <br />n <br />n <br />WASTE DISCHARGE REQUIREMENTSORDER NO. R5-2003-0020 -29- <br />FOR COUNTY OF SAN JOAQUIN <br />FOR CONSTRUCTION, OPERATION, CLOSURE AND EVALUATION MONITORING <br />FOOTHILL SANITARY LANDFILL, MUNICIPAL SANITARY LANDFILL <br />SAN JOAQUIN COUNTY <br />12. The Discharger shall complete the tasks contained in these waste discharge requirements <br />in accordance with the following time schedule: <br />Task Compliance Date <br />A. Construction Plans <br />Submit construction and design plans Prior to construction <br />for Executive Officer review and approval. <br />(See Construction Specification D.1) <br />B. Construction Report <br />Submit a construction report upon completion Prior to discharge <br />demonstrating construction was in accordance <br />with approved construction plans for Executive <br />Officer review and approval. <br />(See Construction Specification D.6) <br />C. Evaluation Monitoring Program <br />Submit an Engineering Feasibility Report which 1 June 2003 <br />includes closure of Module "P' (see Provision J.l .c.) <br />D. Partial Cover <br />Submit a Workplan for the design and construction 1 June 2003 <br />of the soil cover for all modules in the Unit. <br />Address the performance standards for precipitation <br />and drainage controls. <br />E. Financial Assurance Review <br />1. Annual Review of Financial Assurance for 30 April each year <br />initiating and completing corrective action <br />(see Provision J.10.) <br />2. Annual Review of Financial Assurance for 30 April each year <br />closure and postclosure maintenance <br />(see Provision J.11.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.