My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 3:43:09 AM
Creation date
7/3/2020 10:42:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2005
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
708
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Postclosure Costs for LFG System <br /> Foothill Landfill <br /> Rev March 16, 2005 <br /> BASIS Landfill Acreage 673 acres <br /> LFG Field $4,179,275 <br /> Flare station $500,000 <br /> Maintenance/replacement by equipment life <br /> 5% of LFG field $208,964 per year <br /> 10% of Flare Station $50,000 per year <br /> $258,964 per year <br /> Operation <br /> SJ Co contract w/contractor for two landfills $48,000 per year (cost basis) (1) <br /> Area of landfills 155 acres (cost basis) (2) <br /> Unit cost $310 per acre per year <br /> Area of Foothill Landfill at closure 673 acres <br /> Pro-rated cost $208,413 per year <br /> Source Test (not needed candlestick flare) $0 <br /> Surface emission monitoring $80,760 per year <br /> Laboratory Analysis $10,000 per year <br /> $299,173 per year <br /> Electrici <br /> Performance 40"vac, 10" pressure 2 Blowers operating (ea) <br /> Design Flow 2000 SCFM 50 hp motor(ea) <br /> 75.0 kW max rated <br /> 75.0 kW normal load <br /> $0.15 /kW hr <br /> 8760 hours per year <br /> $98,550 per year <br /> Permitting and Admin 200 hours per year <br /> $80 per hour <br /> $16,000 per year <br /> Total annual cost $672,687 per year <br /> Rounded $673,000 per year <br /> (1) SCS costs include maintenance of flare station equipment and minor field repairs <br /> 20% contingency <br /> (2)Actual SCS O&M Costs are extrapolated to estimate O&M Costs on a per acre basis. <br /> (3)Costs in 2004 dollars <br /> N:\Miscellaneous\ClosCostEst\FH Clo-PostClo.xls, LFG O&M Printed 7/5/2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.