My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 3:43:09 AM
Creation date
7/3/2020 10:42:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2005
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
708
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the . downloading of the computer, the billing for the waste <br /> delivered to the Landfill, armored car service and cash <br /> control. COUNTY will provide OPERATOR with monthly state- <br /> ments of waste and gate fees received. OPERATOR will bond <br /> its gatehouse person for FIVE THOUSAND DOLLARS ($5 ,000 .00) . <br /> G. COUNTY shall at its, own expense, provide for all engineering <br /> services required in the design, operation and closure of <br /> the SITE or portions of the SITE, except for the grade <br /> control to be provided by OPERATOR. COUNTY shall develop a <br /> detailed Plan of Operation to be followed by OPERATOR in the <br /> operation of the landfill. COUNTY shall prepare all reports <br /> required by local, state and federal regulatory agencies and <br /> submit information required resulting fro_: periodic reviews <br /> of SITE by such agencies . COUNTY shall also furnish, <br /> construct and monitor all groundwater and landfill gas <br /> monitoring devices required at SITE, <br /> H. COUNTY shall periodically, at COUNTY' S discretion, and also <br /> as required by regulatory agencies, make periodical <br /> inspections of the site to insure that the landfill is <br /> operated in accordance with appropriate regulations, <br /> permits, the Operations Plan, the Report of Disposal Site <br /> Information, the Regional Water Quality Control Board Waste <br /> Discharge Requirements, the Conditional Use Permit, and this- <br /> AGREEMENT. The COUNTY Director of Public Works shall <br /> perform all - engineering inspections and -soil- testing <br /> required, in connection with SITE closure, and postclosure <br /> maintenance. COUNTY also shall provide all engineering <br /> -7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.