Laserfiche WebLink
2. Compliance Evaluation Summary (Cont.) <br /> Parameters Referenced Report Section <br /> C Lab Reports: Are all sample analyses conducted Sample analyses were performed by <br /> by a laboratory accredited by the State Columbia Analytical Services (groundwater) <br /> Department of Health Services? &Atmospheric Analysis &Consulting (soil <br /> gas). The laboratories are certified by <br /> California the Dept of Health Services for <br /> the analyses conducted. Copies of <br /> certifications are included in Appendix C of <br /> the report. <br /> d Wastes: Is there a description of the quantities Waste quantities in tons discharged per <br /> and types of wastes discharged and the month (Table 1). Types of waste accepted in <br /> locations in the WMU where waste has been section Introduction. <br /> placed since submittal of the last monitoring <br /> report? <br /> Surface Water Monitoring <br /> Parameters Referenced Report Section <br /> e Are all surface water Field Parameters, Surface water was available for sampling late <br /> Monitoring Parameters, and COCs (if required) 4th quarter of 2004 and results are included <br /> sampled and analyzed? in this report. Field parameters and <br /> laboratory measured monitoring parameters <br /> are included in the Tabular Summary of <br /> Historical Monitoring Data(Appendix E of <br /> the report). <br /> f Have any surface water concentration limits Discussed in Monitoring Results, Surface <br /> been exceeded? If yes,identify in comments. Water section. <br /> g Run-Off/Run-On: Is there an evaluation of the Run-on/Run-off controls are discussed in <br /> effectiveness of run-off/run-on control section Run-Off/Run-On Facilities. <br /> facilities? <br /> Leachate Monitoring <br /> Parameters Referenced Report Section <br /> h Are all leachate Field Parameters,Monitoring Module "I" unlined. Leachate monitoring is <br /> Parameters, and COCs (if required) sampled required per the RWQCB Monitoring and <br /> and analyzed? Reporting Program (MRP) for module 1. <br /> Monthly test results are summarized in Table <br /> 6. The first annual and 5-year CDCs testing <br /> was performed ls`qtr 2005 (Table 4). <br />