Laserfiche WebLink
• Chart I <br /> Lovelace MRF&TS <br /> Peak Vehicle Trip Counts <br /> Year 2000 2001 2002 2003 2004 <br /> Peak Trip Count-Inbound&Outbound 784 968 1,082 1,069 1,080 <br /> Average Trip Count-Inbound&Outbound 457 526 608 649 635 <br /> +a a DAILY TRIP COUNT <br /> Trips/Day Lovelace Materials Recovery and Transfer Station <br /> 2200 <br /> 2000 - Actual Daily vehicle Trips Probable Future Daily <br /> (2000 through 2004 Vehicle Trips (range) <br /> 1800 -r ? <br /> 1600 Theoretical Dail Vehicle Tris per RDSI:BOO Z <br /> per day <br /> 1400 <br /> 1200 �Vehiclei s Projected for, <br /> 2010 per RDS 1: <br /> 1000 11-55 per day <br /> I <br /> 800 Permitted Daily Vehicle Trips: <br /> 600 705 per day <br /> 400 <br /> 200 <br /> 0 <br /> 1998 Year 2000 2002 2004 2006 2008 2010' <br /> * 2004 Data through November 2004 <br /> N:\2Lovelace\7ripAndTonnageCurves.XLS Printed 12/14/2004 <br />