Laserfiche WebLink
Chart I <br /> Lovelace MRF&TS <br /> Peak Vehicle Trip Counts <br /> Year 2000 2001 2002 2003 2004 <br /> Peak Trip Count-Inbound&Outbound 784 968 1,082 1,069 1,080 <br /> Average Trip Count-Inbound&Outbound 457 526 608 649 635 <br /> DAILY TRIP COUNT <br /> Trips/Day Lovelace Materials Recovery and Transfer Station <br /> 2200 <br /> 2000 Actual Daily Vehicle Trips Probable Future Daily <br /> 1800 <br /> (2000 through 2004 Vehicle Trips (range) <br /> 1600 Theoretical Daily Vehicle Tris ger RDSI: <br /> 1600 per day <br /> 1400 , <br /> 1200 �Qallv Vehicle Tri s Pro'ected for <br /> 1000 ® 2010 per RDSI: <br /> 1155 per day <br /> 800 <br /> Permitted Daily Vehicle Trips: <br /> 600 705 per day <br /> 400 -- <br /> 200 <br /> 0 <br /> 1998 Year . 2000 2002 2004 2006 2008 2010 <br /> *2004 Data through November 2004 <br /> N:\2Lovelace\TripAndTonnageCurves.XLS Printed 12/14/2004 <br />