My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2005_2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2005_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:23 PM
Creation date
7/3/2020 10:42:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2005_2
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2005_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment B <br /> Monitoring Schedule: As Encroachment Permit Applications are filed;and <br /> as reflected in Public Works Capital Improvements <br /> Program <br /> Agency responsible for Public Services Division <br /> Ensuring Compliance: San Joaquin County Department of Public Works <br /> Reporting Requirements: Review of Encroachment Permit Applications;annual <br /> Capital Improvement Program <br /> Alternate Measure <br /> Mitigation Measure No. 5-3: Widen critical roadway segments on French Camp <br /> RoaTand Airport Way to four travel lanes. (Cumulative Impact) <br /> Monitoring Agency: Traffic and Transportation Engineering Division <br /> San Joaquin County Department of Public Works <br /> Monitoring Schedule: As reflected in the Public Works Capital <br /> Improvement Program <br /> Agency responsible for San Joaquin County Department of Public Works <br /> Ensuring Compliance: <br /> Reporting Requirements: Annual Capital Improvement Program as approved <br /> by the San Joaquin County Board of Supervisors <br /> r <br /> ote:Measure No.5-2 or Measure No.5-3 should be implemented. <br /> Mitigation Measure No.5-4: The project proponent should reconstruct that portion <br /> of Lovelace Road along the project frontage so that a two-way left turn lane (center turn <br /> lane) can be added. <br /> Monitoring Agency: Public Services Division <br /> San Joaquin County Department of Public Works <br /> Monitoring Schedule: Based on warrants established by the Traffic and <br /> -Transportation Engineering Division of the San <br /> Joaquin County Department of Public Works <br /> Agency responsible for San Joaquin County Department of Public Works <br /> Ensuring Compliance: <br /> Reporting Requirements: Improvement Plan approval,inspection and Notice of <br /> Completion <br /> Mitigation Measure No. 5-5: A procedure should be established to provide for the <br /> cleanup of waste spills due to traffic accidents associated with the Transfer Station. <br /> (Refer to Appendix S of the Final EIR.) <br /> Oonitoring Agency: Office of Emergency Services <br /> San Joaquin County <br /> MMP:7-6-93 B-2 Page 2 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.