My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2006_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:23 PM
Creation date
7/3/2020 10:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_1
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2006_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 8 <br /> SECTION 8. MATERIALS <br /> 8-1.01 GENERAL.--Attention is directed to Section 6, "Control of <br /> Materials," of the Standard Specifications and these special provisions. <br /> 8-1.02 CONTROL OF MATERIAL.--A minimum of one week prior to <br /> hauling materials, the Contractor shall submit in writing, a statement describing the <br /> material sources and the intended haul routes for all contract items. This statement <br /> will not be required for contract items of quantities less than 170 C.Y. or 200 Tons. <br /> The Engineer reserves the right to change haul routes at any time according to <br /> the best interest of the County. If the Engineer changes a haul route, an adjustment will <br /> be made in the contract unit price of the items affected. The adjustment in the contract <br /> unit price of the items affected shall be done by change order prior to any hauling. Any <br /> hauling done without a contract change order, regardless of routes used, shall be done <br /> at the original contract price and no adjustment shall be made. Adjustment will be <br /> based on Public Utilities Commission rates and the price of the item in question will be <br /> increased or decreased in relation to,the change in the length of the one-way haul to the <br /> job. <br /> Only one way to the job mileage will be considered and no allowance will be <br /> made for the condition of the roadway. If the new route leads through a congested area <br /> within the corporate limits of a city, an adjustment in the unit price of the affected item <br /> may be made on a time basis. <br /> 8-1.03 WEIGHING MATERIALS.—Attention is directed to Section 9, <br /> "Measurement and Payment,"of the Standard Specifications and these special <br /> provisions. <br /> The cost shall be considered as included in other contract items of work, and no <br /> further allowance shall be made therefor. <br /> In no event will County pay for any portion of a load of material which is in excess <br /> of the legal load limit for the vehicle transporting it. The payment for the weight of all <br /> material in excess of legal load limits will be deducted from the contract pay quantity for <br /> that specific material. <br /> 8-1 <br /> (SPECSIMASTEf21C0-8-1) <br />
The URL can be used to link to this page
Your browser does not support the video tag.