Laserfiche WebLink
Landfill Gas Monitoring Probe Installation Report October 2009 <br /> Foothill Sanitary Landfill Project No.03160203 <br /> TABLE OF CONTENTS <br /> 1.0 INTRODUCTION.......................................................................................... 1 <br /> 2.0 FIELD WORK................................................................................................ 2 <br /> 2.1 Permitting and Health and Safety...........................................................2 <br /> 2.2 Landfill Gas Migration Monitoring Well Installation.............................2 <br /> 2.2.1 Soil Logging and Sampling ...........................................................3 <br /> 2.2.2 Landfill Gas Migration Monitoring Well Construction ...............3 <br /> 3.0 DISCUSSION................................................................................................ 6 <br /> 4.0 REFERENCES............................................................................................... 7 <br /> 5.0 LIMITATIONS............................................................................................... 8 <br /> ATTACHMENTS <br /> Table 1 Landfill Gas Migration Monitoring Well Construction Dimensions <br /> Table 2 Perimeter Landfill Gas Migration Monitoring Well Locations <br /> Figure 1 Site Location <br /> Figure 2 Site Plan <br /> Figure 3 Monitoring Well Detail <br /> LIST OF APPENDICES <br /> Appendix A Boring Logs <br /> Appendix B Photographs <br /> Appendix C Daily Field Reports <br /> Vector Engineering, Inc.• 143E Spring Hill Drive•Grass Valley, CA 95945•(530)272-2448 <br /> -i- <br />