Laserfiche WebLink
Table 1 <br /> Foothill Landfill <br /> Landfill Gas Migration Monitoring Well Construction Dimensions <br /> 77, <br /> Date Probe Vector Boring Probe Perforation Intervals Probe Gravel Rack Intervals <br /> Well No inspector Depth (ft, (ft, 4s) (ft, bgs) <br /> Installed <br /> Shallow Intermediate Deep Shallow Intermediate Deep <br /> SG-102 8/6/2009 Holland 98 7- 10 15.5 -49 54.5 -94 6.5 - 10 1S -49 S4- 98 <br /> SG-103 8/7/2009 Sample 100 7 - 10 15.5-45* 50.5-95* 6.5 - 10 15 -45* SO- 100* <br /> SG-104 8/11/2009 Sample 92 7 - 10 15.5 -48 53.S-92 6.5 - 10 IS -48 53 -92 <br /> SG-105 8/10/2009 Peevers 101 7 - 10 15.5-53 58.5 - 101 6.5 - 10 15 - 53 58- 101 <br /> SG-106 1 8/13/2009 Sample 120 7 - 10 15.5- 62 67.5 - 120 6.5- 10 15 - 62 67 - 120 <br /> SG-107 8/11/2009 Holland 150 7 - 10 15.5-75 80.5 - 146 6.5 - 10 15 - 75 80- 150 <br /> SG-108 8/12/2009 Holland 155 7 - 10 15.5 -77 82.5 - 149 6.5 - 10 IS -77 82 - 155 <br /> SG-109 8/13/2009 Holland 170 7 - 10 15.5-78* 83.5 - 166* 6.5 - 10 15 -78* 83 - 170* <br /> SG-110 8/14/2009 Holland 166 7 - 10 15.5 -82 87.5- 160 6.5 - 10 15 - 82 87 - 166 <br /> SG-111 8/17/2009 Sample 128 7 - 10 15.5-66 71.5 - 128 6.5- 10 15 - 66 71 - 128 <br /> SG-112 8/6/2009 Sample 106 7 - 10 15.5- 55 60.5 - 106 6.5 - 10 15 -55 60 - 106 <br /> SG-113 8/5/2009 Peevers 103 7 - 10 15.5-54 59.5 - 103 6.5 - 10 15 - 54 59- 103 <br /> SG-114 8/4/2009 Peevers 74 7- 10 15.5-39 44.5 -74 6.5 - 10 15 - 39 44-74 <br /> SG-115 8/3/2009 Peevers 66 7- 10 15.5- 35 40.5 -66 6.5- 10 15 - 35 40-66 <br /> SG-116 7/31/2009 Peevers 72 7 - 10 15.5- 38 43.5 -72 6.5 - 10 15 - 38 43 -72 <br /> SG-117 7/30/2009 Peevers 66 7 - 10 15.5 - 35 40.5 - 66 6.5 - 10 15 -35 40 - 66 <br /> SG-118 7/30/2009 Sample 63 7- 10 15.5- 34 39.5-63 6.5 - 10 15- 34 39-63 <br /> SG-119 7/31/2009 Sample 64 7 - 10 15.5- 34 39.5- 64 6.5 - 10 15 - 34 39 - 64 <br /> SG-120 8/4/2009 Sample 92 7 - 10 15.5-49* 54.5- 92* 6.5 - 10 15 -49* 54 -92* <br /> SG-121 8/3/2009 Holland 86.5 6 - 9* 15.5 -53* 58.5-86* 5.5- 10* 15 - 53* 58-86.5* <br /> SG-122 7/31/2009 Holland 69.5 7 - 10 15.5 - 37 42.5- 69 6.5 - 10 15 - 37 42 -69.5 <br /> SG-123 7/31/2009 Holland 68.5 7 - 10 15.5 - 36 41.5 - 68 6.5 - 10 15 - 36 41- 68.5 <br /> SG-124 7/30/2009 Holland 88 7 - 10 15.5-46 51.5 - 87 6.5 - 10 15 -46 51 -88 <br /> SG-125 8/5/2009 Sample 1 85 7- 10 15.5-45 50.5 -85 6.5 - 10 15 -45 50- 85 <br /> NOTES: <br /> ft, bgs =feet below ground surface; <br /> * = probe interval that was modified fron'i the plans and specification due to the occurrence of high permiability sand lens <br />