Laserfiche WebLink
E <br />U) <br />L- <br />cz <br />C) <br />0 <br />cz <br />2 <br />A <br />4- <br />0 <br />ca <br />0 <br />CL <br />Greenville Fault <br />Calaveras Fault <br />C���c� <br />oval �'�� <br />MEE <br />5 5.5 6 6.5 7 <br />Magnitude <br />Figure 1. 100 year probability of at least one earthquake with magnitude greater than <br />M based on the fault parameters given in Table 1. For this study, the MPE magnitude <br />is estimated from approximately 0.3 probability in 100 years. <br />