My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_5
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2010_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 8:37:49 PM
Creation date
7/3/2020 10:44:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_5
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2010_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
597
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
't 4_6 EMPLOYEE TRAINING <br />The site superintendent is responsible for training employees responsible for <br />is <br />implementing the various aspects of the SWPPP. Employees with SWPPP <br />F. <br />responsibilities shall be trained for spill response, handling hazardous <br />materials used, good housekeeping practices within the yard, material <br />e: <br />management practices and maintenance of the storm drainage system. The <br />training shall be accomplished along with the scheduled training sessions <br />�F when <br />identified in the Hazardous Materials Management Plan (Appendix B). Also, <br />necessary, storm water drainage issues and the SWPPP shall be briefly covered <br />at morning personnel meetings when assignments are given for the day. <br />Furthermore, all employees and the public shall have on site access to the <br />facility's Hazardous Materials Management and SWPPP Plans. <br />4.7 INSPECTIONS <br />The Foothill Sanitary Landfill shall be inspected per the schedule in Section <br />4.2 for preventive maintenance and good housekeeping. <br />All inspections except for the annual, October 1, inspection shall be done by <br />the site superintendent. A follow-up compliance procedure shall be used to <br />ensure appropriate response has been taken to an inspection report of SWPPP <br />deficiency. SWPPP Inspections and maintenance activities shall be documented. <br />SWPPP Inspection records shall be retained for five (5) years. <br />An annual facilities inspection shall be conducted by the facility engineer on <br />or about October 1 of each year. The inspection shall verify that all elements <br />of the SWPPP are accurate. Additionally, the inspection shall identify any <br />changes in operations that should be addressed as a revision to the SWPPP. <br />In addition, the surface storm water runoff on site is to be inspected once <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.