Laserfiche WebLink
S <br />* Preliminary final grades for future landfill phases <br />* Site life projections <br />* Preliminary excavation plans for the next lined landfill <br />unit <br />2.4 Site operations: <br />Operations to date have been by the operator. This has included <br />placement, compaction and cover of waste, 'excavation for cover, <br />construction of access roads, construction of winter pads, and <br />construction of drainage facilities. <br />0 <br />