Laserfiche WebLink
Notes <br /> 1 Estimates for capital costs for initial Iron Sponge system purchase and installation are based on estimates obtained from <br /> MVLLC Company from their experience with the Iron Sponge technology. <br /> 2 The design,permitting,and startup costs for the catalyst systems were estimates made by SCS Engineers from recent experience. <br /> 3 Applied at 8.75%rate for major equipment purchases <br /> 4 A 10%contingency was applied and considered reasonable for the uncertainties with this project <br /> 5 MVLLC estimate assuming$0.15/lb cleanout and SCS estimates$350/ton or$0.2/lb disposal cost as hazardous waste. <br /> 6 SCS estimate based on$25,100 per changeout. Cost includes 3 trucks at$7,500/load,2 men at$50/hr for 8 hours each, <br /> and a crane rental for$1,800/day including increased transportation costs to hazardous waste site <br /> 7 SCS estimate 5%of capital costs <br /> 6 SCS estimates 2.5 kW required at$0.11 kW-hr for a full year(8,760 hours) <br />