My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2011_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:37 PM
Creation date
7/3/2020 10:44:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011_1
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2011_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ad..—dARUTECr <br /> CONFIDENTIAL AND PROPRIETARY <br /> ' Emissions(Guaranteed by ABUTEC LLC) <br /> Destruction Efficiency: 99.9%DRE,In Full Operation Range <br /> NOX Emissions: Less than 0.041 lbs/mmBTU(<34 ppm at 3%02) <br /> CO Emissions: Less than 0.20 lbs/mmBTU (corrected to 3%02); <br /> NMOC Emissions Less than 20 ppmv DSCFM at 3%02(as hexane) <br /> III. Narrative Solutions (HTF-High Temperature Flare) <br /> General Information Regarding Our Scope of Supply: <br /> All installations according to our technical data sheet are delivered fully mounted, functionally tested(without <br /> gas),and ready for site installation and operation.ABUTEC will include a Factory Acceptance Test(FAT) <br /> Report upon completion of the FAT. <br /> General Process Engineering Data: <br /> The flare will have an AUTO/MANUAL/OFF setting on the control panel. In AUTO mode,the flare will be <br /> in standby awaiting sufficient LFG pressure(as sensed by the pressure transmitter—field settable). Once the <br /> "Flare Start"pressure is reached,the pilot solenoid(s)will open and the spark igniter will begin sparking. The <br /> UV sensor(already searching for a flame)will indicate when the pilot is ignited. Once the UV Sensor detects <br /> that the pilot flame is ignited,the LFG Pneumatic Valve(supplied by others)will slowly open and the main <br /> burner will ignite. The louvers will automatically adjust(via a PID loop)to maintain a preset stack <br /> temperature(i.e. 1800 deg F)based on minimum consumption of LFG. When the main process(i.e. 99.9% <br /> Air)stream is ready to burn,an external signal to our Control Panel will signal"ready"and then open the <br /> Pneumatic Valve(supplied by others)on the Process Line. The louvers will continue controlling temperature <br /> to the preset value(i.e. 1800 deg F). We have several safety shutdown's built into the system that will be <br /> discussed and agreed upon during detailed engineering of the system. If a safety shutdown parameter is <br /> reached,the Main Control Valves(Air& LFG)will close within 3 seconds. <br /> Technical Description of BIOGAS COMBUSTION UNIT(HTF): <br /> ' Dimension* ' ' . <br /> Number of Burner Circles* l Internal Burner Circles for h <br /> Process Stream and 1 <br /> Internal Burner for Landfill <br /> x <br /> Gas �ubri�l �� a" �yKti�� 1iiu11 ��d h <br /> Purge Gas/VOC Inlet 8 inch <br /> Aux Fuel LineLFG <br /> ( )* 2 inch <br /> Total Height Excluding HTF 1.3: 30ftI' aa�ri <br /> Foundation* gyp"� t <br /> Page 5 of 14 Documents/Quotations/2010.159.006AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.