Laserfiche WebLink
• New 6-in LFG pipe to <br /> serve GX-7 and-9, <br /> replaces 3-in pipes <br /> 0 'rA. <br /> Side Slopes <br /> Larger LFG Pipes installed, Access over Pipes Provided <br /> Some minor drainage problems were discovered and corrected. <br /> • Before: <br /> r <br /> Inlet obstructed by debris (northern <br /> corner of top deck). <br /> tn, <br /> a3 fri � F Pi <br /> } z <br /> After: <br /> �a <br /> Inlet obstruction removed <br /> • <br /> Foothill Sanitary Landfill 20 Department of Public Works/Solid Waste <br /> 2nd Semester and Annual 2011 Groundwater Monitoring County of San Joaquin—January 31,2012 <br />