Laserfiche WebLink
• <br /> Berm removed <br /> Before: <br /> Drainage berm removed <br /> temporarily for equipment access <br /> (eastern side of top deck) <br /> Berm restored <br /> After: <br /> Drainage berm restored <br /> t - <br /> ys ij, .r }^u7K <br /> t i <br /> allfP� <br /> • <br /> Foothill Sanitary Landfill 22 Department of Public Works/Solid Waste <br /> 2°d Semester and Annual 2011 Groundwater Monitoring County of San Joaquin—January 31,2012 <br />