Laserfiche WebLink
Shaw Environmental • <br /> FIELD REQUEST <br /> PROJECT NAME: Foothill Landfill,San Joaqu' ty <br /> SCHEDULED DATE: October 2011 <br /> SPECIAL INSTRUCTIONS/CONSIDERATIO ect Mngr: C Isham <br /> 2nd Semester(4th Quarter 2011) Sa it Ph: 91 -565-4316 <br /> (2nd/4th Quarters: GW Levels Only) J e ncord Dir: 25-288-2381 <br /> ProjectNo.: 39867.1100- <br /> ~ Sampler Paul Weinhardt <br /> Cell Phon . 530-391-4037 <br /> Need 500'sounder-wells>200 feet Well Lock <br /> Number(s) <br /> Notify Mike Carroll prior to monitoring even 0464 <br /> Phone(209)468-8504 Or via E-mail<mcarro j ov.or > #18 in caddy <br /> ST SIGN IN THE <br /> Site Contact: Jess Padilla 209-887-3969 SCALE HO H <br /> Well Number Casing Casing Depth to <br /> or Source Diameter Length Water ANALYSES REQUESTED <br /> (inches) (feet) (feet) <br /> Last Event: 8/9/2011 <br /> Water levels/elevations for all wells. <br /> MW-1 5.0 212.8 208.68 <br /> (New pump 2/3/10) (8/17/09) <br /> MW-2R 2.0 280.0 255.81 <br /> MW-3 4.0 292.4 273.12 <br /> MW-4 2.0 298.0 285.71 <br /> MW-5 2.0 210 217.16 <br /> LW-1(Water supply well) 161.94 <br /> Laboratory and Lab QC Instructions: <br /> BC Labs-Tina Green <br /> 4100 Atlas Court <br /> Bakersfield,Ca 93308 <br /> 661-327-4911/Fx:327-1918 <br /> Ship via UPS Acct 965376 <br /> Field Support: Peter Bins (408)391-2942 <br /> • <br /> Ft Hill GW Lvls only 2&4 Page 1 of 2 <br />