Laserfiche WebLink
TEMPORARY SCH 40 PVC SLIP CAP <br />ION DATE DES CK <br />2 <br />LFG EXTRACTION WELL SCHEDULE <br />SURFACE <br />COMPLETION 5 5 <br />-- <br />COORDINATES ELEVATION (FT MSL) <br />DEPTHS (FT) (SEE NOTE 1) <br />FINISH GRAD <br />SOIL BACKFILL MOUND <br />- ---- <br />1. DEPTHS ARE APPROXIMATE. ALL <br />DEPTHS ARE NOTED FROM GROUND <br />1 <br />RECOMPACTED SOIL BACKFILL <br />��"�•• �� <br />ELEVATION. ACTUAL GROUND <br />z <br />ELEVATIONS MAY HAVE CHANGED. <br />/ <br />---REFUSE- <br />LANDTEC WBS -100 WELL SKIRT 6'X6• <br />2. WELL LOCATION MAY BE ADJUSTED IN <br />o <br />�'�' ^ ^Y ENGINEER. <br />Z <br />/ <br />-^REFUSES- <br />OIL BACKFILL <br />THICKNESS VARIES(TYP) <br />CTOR SHALL STAKE WELL <br />0 <br />HDPE OVERUNER. <br />3 - <br />NS. COORDINATES AND <br />)NS ARE BASED ON SURVEY <br />E <br />- <br />SEE WELL SCHEDULE <br />5 $ <br />TION PRIOR TO WELL <br />ATION. <br />BENTONITE (TYP) <br />­ iTE SEAL REQUIRED WERE <br />' <br />C I I <br />OVERUNER EXISTS, <br />OIL 8ACKFILL-MAX 12" LIFTS <br />2" KANAFLEX HOSE <br />THICKNESS VARIES(TYP) <br />ENTONITE (TYP) <br />n <br />�-- � <br />REFUSE <br />REFUSE— <br />6" DIA. HDPE SDR -11 <br />SS BAND CLAMP <br />nn 90 <br />y <br />SLL--6Acmir. <br />OIL BACKFILL <br />1/2" DIA. HOLE <br />m <br />CONNECT KANAFLEX HOSE(TYP) <br />z <br />_ <br />KAPS TRANSNET (TN) <br />SS BAND CLAMP <br />6" DIA. <br />5 <br />HDPE GEOCOMPOSITE <br />2" DIA WELLHEAD -SEE 3•-6" <br />PIPE <br />m <br />WITH 6 oz FABRIC <br />SPECS <br />4X2 REDUCER <br />BUTT FUSION <br />WELD (TYP) <br />90' ELBOW <br />WELLHEAD FERNCO <br />0 <br />COUPLING <br />4" HDPE LATERAL <br />SS CLAMP <br />0 <br />DIA. HDPE SDR -11 <br />PERFORATED <br />`J` o <br />i <br />COURSE AGGREGATE ROUNDED <br />3% MIN SLOPE <br />TO 6' HEADER <br />BACKFILL <br />SOIL <br />o <br />N <br />PARTICLES 1" TO 3" DIA. <br />NON -CALCEROUS MINIMAL FINES <br />3 WELL CASING PERFORATIONS <br />EXISTING GRADE <br />5 5 SCALE: NTS <br />it WELL CASING 3 <br />a <br />Q <br />E2 <br />PERFORATIONS 5 5 <br />30 <br />6" HDPE SOLID WELL CASING <br />1• <br />6" HDPE SDR -11 FUSED END CAP <br />4 PIPE ANCHOR <br />5 8 <br />BORE DEPTH (SEE WELL SCHEDULE) <br />BORE <br />O <br />FROM EXTRACTION <br />o <br />D <br />BOTTOM OF WASTE (SEE WELL SCHEDULE) <br />WELL <br />1 <br />TYPICAL LFG EXTRACTION WELL <br />2 SURFACE COMPLETION <br />m <br />4 5 <br />SCALE: NTS SECTION <br />5 5 SCALE: NTS <br />SECTION <br />LFG EXTRACTION WELL <br />FOOTHILL SANITARY <br />LANDFILL S5eettf No. <br />COUNTY <br />OF SAN JOA UIN <br />Q <br />NO SCALE <br />DETAIL AND SCHEDULE <br />GAS SYSTEM UPGRADE PHASE 1 <br />DRAWN BY <br />DATE PROJECT ENGINEER <br />DATE CHECKED DATE <br />J. Acevedo <br />11120115 1 J. Acevedo <br />11123115 J. Chandra »/zs/�s <br />