Laserfiche WebLink
0 0 <br />5of15 <br />Project No.: <br />Project: <br />Location: <br />HDPE GEOMEMBRANE SEAMING AND NON-DESTRUCTIVE SUMMARY <br />14-101-01 <br />Construction of Area 2A <br />Foothill Landfill <br />General Contractor: R J Gordon <br />Geosynthetics Subcontractor: Great Basin <br />P:\14Projects\14-101 (SJCDPW North County and Foothill)\Foothill CQA\Report\APP Seaming\SEAMING.xlsx <br />Weld Data <br />Non -Destructive Testing Data <br />Seam Number <br />Date <br />Time <br />Approx. <br />Length <br />Welded <br />(ft) <br />Welding <br />Machine <br />Number <br />Weld <br />Tech. ID <br />Fusion/ <br />Extrusion <br />QA <br />ID <br />Comments <br />Date <br />Tech <br />ID <br />Pass/ <br />Fail <br />QA <br />ID <br />S-5 <br />P-141 <br />8/4/15 <br />10:20 <br />82 <br />115 <br />JA <br />X <br />RN <br />DS -66 <br />8Z5/15 <br />AD <br />VTOK <br />RN <br />S-5 <br />P-141 <br />8/4/15 <br />11:51 <br />82 <br />112 <br />AA <br />X <br />RN <br />Sum2 Riser <br />8Z5/15 <br />AD <br />VTOK <br />RN <br />P-119 <br />EX <br />8Z3/15 <br />3:15 <br />22 <br />112 <br />AA <br />X <br />RN <br />8 5 15 <br />AD <br />VTOK <br />RN <br />P-120 <br />EX 1 <br />8/3/15 <br />3:45 <br />22 <br />1 112 <br />1 AA <br />X <br />RN <br />8 5 15 <br />AD <br />VTOK <br />RN <br />P-121 <br />EX <br />8Z4/15 <br />9:25 <br />22 <br />112 <br />AA <br />X <br />RN <br />8/5/15 <br />AD <br />VTOK <br />RN <br />P-126 <br />EX <br />8/4/15 <br />10:01 <br />76 <br />112 <br />AA <br />X <br />RN <br />8/5/15 <br />AD <br />VTOK <br />RN <br />P:\14Projects\14-101 (SJCDPW North County and Foothill)\Foothill CQA\Report\APP Seaming\SEAMING.xlsx <br />