Laserfiche WebLink
SITE SPECIFIC HEALTH AND SAFETY PLAN FOR <br /> CONSTRUCTION & DRILLING ACTIVITIES AT Foothill Sanitary <br /> Landfill <br /> CB&I Environmental&Infrastructure <br /> April 2016 <br /> Prepared for: Department of Public Works of an Joaquin, CA <br /> Prepared by: <br /> OR <br /> CB&I <br /> 500 Penn Center Blvd. <br /> Pittsburgh,PA, 15235 <br /> "?J!7G� 4 <br /> Project Manager <br /> HSE Manager <br /> The information in this HASP has been designed for the methods presently contemplated by CB&I(CB&I)for execution of the <br /> proposed work. Therefore, this HASP may not be appropriate if the work is not performed by or using the methods presently <br /> contemplated by CB&I. In addition, as the work is performed, conditions different from those anticipated may be encountered <br /> and the HASP may have to be modified. Therefore, CB&I only makes representations or warranties as to the adequacy of the <br /> HASP for currently anticipated activities and conditions <br /> Copyright©CB&L All Rights Reserved <br />