My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2016_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2016_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 3:36:38 PM
Creation date
7/3/2020 10:46:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2016_1
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2016_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Job Safety Analysis <br /> Gas Leachate Tie-In Excavation Wall Collapses • Continuously monitor breathing zone air to determine <br /> levels of contaminants <br /> • Construct diversion ditches or dikes to prevent surface <br /> water from entering excavation <br /> • Provide good drainage of area adjacent to excavation <br /> • Collect ground water/rain water from excavation and <br /> dispose of properly <br /> • Store excavated material at least 2 feet from the edge <br /> of the excavation;prevent excessive loading of the <br /> excavation face <br /> • Provide sufficient stairs,ladders,or ramps when <br /> workers enter excavations over 4 feet in depth <br /> • Place ladders no more than 25 feet apart laterally <br /> • Treat excavations over 4 feet deep as confined spaces <br /> • Complete confined space permit entry procedure <br /> • Slope,bench,shore,or sheet excavations over 5 feet <br /> deep if worker entry is required <br /> • Assign a competent person to inspect,decide soil <br /> classification,proper sloping,the correct shoring,or <br /> sheeting <br /> • Inspect excavations(when personnel entry is required) <br /> daily,whenever conditions change <br /> • Provide at least two means of exit for personnel <br /> working in excavations <br /> Gas Leachate Tie-In Struck by/Against Heavy Equipment • Isolate equipment swing areas <br /> • Identify overhead hazards <br /> • Make eye contact with operators when working in area <br /> • Wear reflective vests when working in area <br />
The URL can be used to link to this page
Your browser does not support the video tag.