My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2016_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2016_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 3:36:38 PM
Creation date
7/3/2020 10:46:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2016_1
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2016_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 3 Task-Specific Air Monitoring/PPE Summary <br /> A downgrade in air monitoring and PPE level must be approved by the HSM. <br /> 0 0 <br /> Site Mobilization Level D NA None Required <br /> Landfill Gas Level D or 4 gas meter Air monitoring required during any digging <br /> Extraction Wells and (02,H2S, or drilling at start up of work at each task <br /> Pipeline Installation LEL, CO) location, then every 30 — 60 minutes based <br /> upon air monitoring results. Monitor 15 <br /> minutes to continuously if action levels <br /> have been reached. <br /> Heavy Equipment Level D 4 gas meter Air monitoring required during any digging <br /> Operation to Support (02,H2S, or drilling at start up of work at each task <br /> Excavation& LEL, CO) location, then every 30 — 60 minutes based <br /> Installation Activities upon air monitoring results. Monitor 15 <br /> minutes to continuously if action levels <br /> have been reached. <br /> Installation of Landfill Level D 4 gas meter Air monitoring required during any digging <br /> Leachate System (02,H2S, or drilling at start up of work at each task <br /> LEL, CO) location, then every 30 — 60 minutes based <br /> upon air monitoring results. Monitor 15 <br /> minutes to continuously if action levels <br /> have been reached. <br /> Installation of Landfill Level D 4 gas meter Air monitoring required during any digging <br /> Flare System (02, H2S, or drilling at start up of work at each task <br /> LEL,CO) location, then every 30 — 60 minutes based <br /> upon air monitoring results. Monitor 15 <br /> minutes to continuously if action levels <br /> have been reached. <br /> Working in Modified Level 4 gas meter Air monitoring required during any digging <br /> excavations/trenches D-3 (02,H2S, or drilling at start up of work at each task <br /> with potential for LEL, CO) location, then every 30 — 60 minutes based <br /> needles or puncture upon air monitoring results. Monitor 15 <br /> hazards minutes to continuously if action levels <br /> have been reached. <br /> General site duties, Level D N/A N/A <br /> system O&M, <br /> operation of <br /> equipment,etc. <br /> Note: "Start up of work at each new task location"means to monitor the air quality at each new operation <br /> on the site. The breathing zone is the area inside a 1-foot radius around the head. <br /> 1-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.