Laserfiche WebLink
Job Safety Analysis <br /> Pre-Job Preparation Safety Access/Location Employee Authorization to STOP Work <br /> 1. Get Permit for Job Operations of a Drill Rig: I have been given authorization,without fear of reprimand or retaliation,to immediately <br /> 2. Fill out JSA <br /> 3. Review JSA(EVERYONE) STOP any work activity that presents a danger to me,my co-worker or the public;get <br /> 4. Sign JSA(EVERYONE) Wind Direction: involved,question and rectify any situation that is identified as not being in compliance <br /> with our safety and health policies;to report any unsafe conditions or acts to supervision <br /> Evacuation Route: and question any activity that involves violation of established Safety and Health policies. <br /> Assembly Point: <br /> Job Tasks: (What are you doing?) Potential Hazards: Recommended Action or Procedure to <br /> eliminate/miti ate Hazards <br /> Drilling Struck by/Against Heavy Equipment, Flying Debris, • Wear reflective warning vests working around drill rig <br /> Protruding Objects • Isolate equipment swing areas <br /> • Make eye contact with operators before approaching <br /> equipment <br /> • Barricade or enclose the drilling area <br /> • Require backup alarms on all heavy construction <br /> equipment <br /> • Restrict entry to the work area to authorized personnel <br /> during drilling activities <br /> • Wear hard hats,safety glasses with side shields,or <br /> splash/face shields and goggles,and steel-toe safety <br /> boots at all times <br /> Drilling Sharp Objects • Wear cut/needle resistant work gloves and hard knee <br /> pads when the possibility of lacerations or other injury <br /> may be caused by sharp edges or objects <br /> • Inspect work areas for sharp objects before driving into <br /> the area. <br /> • Maintain all hand and power tools in a safe condition <br /> • Keep guards in place during use <br />