Laserfiche WebLink
1.2 Site Description/Background Information <br /> The Solid Waste Division of CB&I is a specialized construction company which manufactures and <br /> installs methane recovery systems for landfills. This work involves the use of heavy equipment used for <br /> earth-moving, specialized drilling equipment, and other equipment commonly used during construction <br /> activities. CB&I normally drills and installs the gas recovery wells, and then trenches and installs the <br /> piping system. Other work may be conducted as it relates to the design and installation of recovery <br /> systems. <br /> 1.3 Scope of Work <br /> This plan addresses health and safety issues involved with the following tasks: <br /> • Site mobilization; <br /> • Layout Work and Survey; <br /> • LFG Extraction Well Surface and Completion—4 EA; <br /> • Pipe Trenching—255 LF; <br /> • Abandon 260 LF Boring Soil; <br /> • Connection to 12"LFG Header; <br /> • Header Connection—4 EA; <br /> • Install 100 LF 2"HDPE Pipe; <br /> • Install 909 LF 4"HDPE Pipe; <br /> • Install 1m874 LF 6"HDPE Pipe; <br /> • Install 80 EA Pipe Stakes; <br /> • LFG Condensate Sump; <br /> • Condensate Tank; <br /> • LFG Extraction Well—322 LF; <br /> • Header Isolation Valve— 1 EA; <br /> • Soil Monitoring Well— 1,240 LF; <br /> • Soil Gas Well Surface Completion—5 EA; <br /> • Bollards— 15 EA; <br /> • Electrical Site Work; <br /> • Electrical Trench—30 LF. <br /> • Installation of landfill flare systems. <br />