My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2016_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2016_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 3:36:38 PM
Creation date
7/3/2020 10:46:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2016_1
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2016_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.2 Site Description/Background Information <br /> The Solid Waste Division of CB&I is a specialized construction company which manufactures and <br /> installs methane recovery systems for landfills. This work involves the use of heavy equipment used for <br /> earth-moving, specialized drilling equipment, and other equipment commonly used during construction <br /> activities. CB&I normally drills and installs the gas recovery wells, and then trenches and installs the <br /> piping system. Other work may be conducted as it relates to the design and installation of recovery <br /> systems. <br /> 1.3 Scope of Work <br /> This plan addresses health and safety issues involved with the following tasks: <br /> • Site mobilization; <br /> • Layout Work and Survey; <br /> • LFG Extraction Well Surface and Completion—4 EA; <br /> • Pipe Trenching—255 LF; <br /> • Abandon 260 LF Boring Soil; <br /> • Connection to 12"LFG Header; <br /> • Header Connection—4 EA; <br /> • Install 100 LF 2"HDPE Pipe; <br /> • Install 909 LF 4"HDPE Pipe; <br /> • Install 1m874 LF 6"HDPE Pipe; <br /> • Install 80 EA Pipe Stakes; <br /> • LFG Condensate Sump; <br /> • Condensate Tank; <br /> • LFG Extraction Well—322 LF; <br /> • Header Isolation Valve— 1 EA; <br /> • Soil Monitoring Well— 1,240 LF; <br /> • Soil Gas Well Surface Completion—5 EA; <br /> • Bollards— 15 EA; <br /> • Electrical Site Work; <br /> • Electrical Trench—30 LF. <br /> • Installation of landfill flare systems. <br />
The URL can be used to link to this page
Your browser does not support the video tag.